The tables below show technical scopes that may be assessed in training and consultancy work. They do not declare an accreditation scope held by AKREKAL; the methods, ranges and conditions applicable to your organisation are verified separately.
| Inspection//Underground/Aboveground Tanks Storing Flammable or Non-Flammable Liquids and Liquid Petroleum Products, and Connected Pipelines | 42.A.1. Underground/Aboveground Tanks Storing Flammable or Non-Flammable Liquids and Liquid Petroleum Products, and Connected Pipelines | 42.A. Interstitial Leak Detection | |
| Inspection//Underground/Aboveground Tanks Storing Flammable or Non-Flammable Liquids and Liquid Petroleum Products, and Connected Pipelines | 42.B.1. Underground/Aboveground Tanks Storing Flammable or Non-Flammable Liquids and Liquid Petroleum Products, and Connected Pipelines | 42.B. Gas-Free Inspection | |
| Inspection/Railway Subsystems/Common Safety Method for Risk Evaluation and Assessment | Infrastructure | Common Safety Method for Risk Evaluation and Assessment | UTP GEN-G |
| Inspection/Railway Subsystems/Common Safety Method for Risk Evaluation and Assessment | Traction and Towed Vehicles | Common Safety Method for Risk Evaluation and Assessment | UTP GEN-G |
| Inspection/Railway Subsystems/Common Safety Method for Risk Evaluation and Assessment | Energy | Common Safety Method for Risk Evaluation and Assessment | UTP GEN-G |
| Inspection/Railway Subsystems/Common Safety Method for Risk Evaluation and Assessment | Control, Command and Signalling | Common Safety Method for Risk Evaluation and Assessment | UTP GEN-G |
| Inspection/Railway Subsystems/Common Safety Method for Risk Evaluation and Assessment | Operational and Organisational | Common Safety Method for Risk Evaluation and Assessment | UTP GEN-G |
| Inspection/Railway Subsystems/Independent Safety Assessment | Infrastructure | Independent Safety Assessment | EN 50126-1:2017 |
| EN 50126-2:2017 | |||
| Inspection/Railway Subsystems/Independent Safety Assessment | Traction and Towed Vehicles | Independent Safety Assessment | EN 50126-1:2017 |
| EN 50126-2:2017 | |||
| Inspection/Railway Subsystems/Independent Safety Assessment | Energy | Independent Safety Assessment | EN 50126-1:2017 |
| EN 50126-2:2017 | |||
| Inspection/Railway Subsystems/Independent Safety Assessment | Control, Command and Signalling | Independent Safety Assessment | EN 50126-1:2017 |
| EN 50126-2:2017 | |||
| EN 50128:2011+A2:2020 | |||
| EN 50129:2018 | |||
| Inspection/Railway Subsystems/Independent Safety Assessment | Traffic Operation and Management | Common Safety Method for Risk Evaluation and Assessment | UTP GEN-G |
| Inspection/Railway Subsystems/Independent Safety Assessment | Infrastructure | Independent Safety Assessment | EN 50126-1:2017 |
| EN 50126-2:2017 | |||
| Inspection/Railway Subsystems/Common Safety Method for Risk Evaluation and Assessment | Maintenance | Common Safety Method for Risk Evaluation and Assessment | UTP GEN-G |
| Inspection/Railway Subsystems/Common Safety Method for Risk Evaluation and Assessment | Safe Integration | Common Safety Method for Risk Evaluation and Assessment | UTP GEN-G |
| Inspection/Railway Subsystems/Common Safety Method for Risk Evaluation and Assessment | Safety Management System (Operational and Organisational Changes) | Common Safety Method for Risk Evaluation and Assessment | UTP GEN-G |
| Inspection/Electrical/Storage Batteries | 6.A.5.1 Visual Inspection of Storage Batteries | 6.A. Periodic Inspection | Health and Safety Requirements for the Use of Work Equipment |
| Inspection/Electrical/Storage Batteries | 6.A.5.2 Functional Inspection of Storage Batteries | 6.A. Periodic Inspection | Regulation on Health and Safety Requirements for the Use of Work Equipment |
| Voltage/Current Check | |||
| Cable / Connection Insulation Check | |||
| Gas Release and Ventilation Check | |||
| Circuit Breaker Check | |||
| Earthing / Continuity Check | |||
| Charging Unit Checks | |||
| Rectifier Unit Checks | |||
| Inspection/Electrical/High-Voltage Systems | 6.A.4.1. Visual Inspection of High-Voltage Systems | 6.A. Periodic Inspection | Regulation on Health and Safety Requirements for the Use of Work Equipment |
| Regulation on Electrical Power Installations | |||
| Regulation on Earthing in Electrical Installations | |||
| Inspection/Electrical/High-Voltage Systems | 6.A.4.2. Functional Inspection of High-Voltage Systems | 6.A. Periodic Inspection | Regulation on Health and Safety Requirements for the Use of Work Equipment |
| Transformer | Regulation on Electrical Power Installations | ||
| Circuit Breaker/Disconnector Check | Regulation on Earthing in Electrical Installations | ||
| Relay Check | |||
| Earthing Check Above 1 kV | |||
| Storage Battery/Rectifier Check | |||
| Insulation Check | |||
| Power Transmission Line Check | |||
| Inspection/Accreditation for Notification/Recreational Craft and Personal Watercraft Regulation (2013/53/AB) — Additional assessment document for this scope: EA 2/17 — Note: This scope applies only to Notified Body activities in the mandatory regulatory field. | Recreational Craft | Internal Production Control and Supervised Product Testing (Module A1) | 2013/53/EU Recreational Craft and Personal Watercraft Regulation |
| Personal Watercraft | |||
| Inspection/Accreditation for Notification/Recreational Craft and Personal Watercraft Regulation (2013/53/AB) — Additional assessment document for this scope: EA 2/17 — Note: This scope applies only to Notified Body activities in the mandatory regulatory field. | Noise Emissions | Internal Production Control and Supervised Product Testing (Module A1) | 2013/53/EU Recreational Craft and Personal Watercraft Regulation |
| Inspection/Indoor and Outdoor Crime Scene Examination | Indoor and Outdoor Crime Scene Examination | Crime scene assessment and planning the scene examination | |
| Inspection/Indoor and Outdoor Crime Scene Examination | Indoor and Outdoor Crime Scene Examination | Searching for, Recording and Collecting Evidence | |
| Trace Evidence | |||
| Footwear and Tyre Marks | |||
| Toolmarks | |||
| Alterations | |||
| Physical Fit Examination | |||
| Inspection/Accreditation for Notification/Simple Pressure Vessels Regulation (2014/29/AB) — Additional assessment document for this scope: EA 2/17 — Note: This scope applies only to Notified Body activities in the mandatory regulatory field. | Simple Pressure Vessels | Conformity to Type Based on Internal Production Control (Module C) | 2014/29/AB Annex II |
| Inspection/Accreditation for Notification/Lifts Regulation (2014/33/AB) — Additional assessment document for this scope: EA 2/17 — Note: This scope applies only to Notified Body activities in the mandatory regulatory field. | Lifts | Final Inspection of Lifts | 2014/33/AB Annex V |
| Inspection/Accreditation for Notification/Pressure Equipment Regulation (2014/68/AB) — Additional assessment document for this scope: EA 2/17 — Note: This scope applies only to Notified Body activities in the mandatory regulatory field. | Pressure Equipment | Approval of Permanent Joining Procedures | 2014/68/AB Annex 1, 3.1.2 |
| Inspection/Accreditation for Notification/Pressure Equipment Regulation (2014/68/AB) — Additional assessment document for this scope: EA 2/17 — Note: This scope applies only to Notified Body activities in the mandatory regulatory field. | Pressure Equipment | Module A2: Internal Production Control Plus Supervised Pressure Equipment Checks at Random Intervals | 2014/68/AB Annex III |
| Inspection/Transport of Dangerous Goods | Dangerous Goods Transport Equipment | Type Approval | ADR (Chapter 6.12) |
| Packagings | Design Type Approval | ADR (Chapter 6.11), RID (Chapter 6.11) | |
| UN-Certified Pressure Receptacles | Initial Inspection | ADR (Chapter 6.10), RID (Chapter 6.10) | |
| Non-UN-Certified Pressure Receptacles | Periodic Inspection | ADR (Chapter 6.9), RID (Chapter 6.9) | |
| Aerosol Dispensers, Small Receptacles Containing Gas (Gas Cartridges) and Fuel Cell Cartridges Containing Liquefied Flammable Gas | Intermediate Inspection | ADR (Chapter 6.8), RID (Chapter 6.8), IMDG Code (Chapter 6.8) | |
| Packagings for Infectious Substances | Exceptional Checks | ADR (Chapter 6.7), RID (Chapter 6.7), IMDG Code (Chapter 6.7) | |
| Class 7 Packagings | Quality Assurance System | ADR (Chapter 6.6), RID (Chapter 6.6), IMDG Code (Chapter 6.6) | |
| Intermediate Bulk Containers (IBCs) | In-House Inspection | ADR (Chapter 6.5), RID (Chapter 6.5), IMDG Code (Chapter 6.5), ICAO TI (Part 6 Chapter 8), IATA DGR (6.8) | |
| Large Packagings | In-House Certification | ADR (Chapter 6.4), RID (Chapter 6.4), IMDG Code (Chapter 6.4), ICAO TI (Part 6 Chapter 7), IATA DGR (10.5, 10.6) | |
| Portable Tanks and UN-Certified Multiple-Element Gas Containers (UN-MEGCs) | ADR (Chapter 6.3), RID (Chapter 6.3), IMDG Code (Chapter 6.3), ICAO TI (Part 6 Chapter 6), IATA DGR (6.5) | ||
| Fixed Tanks (Tank-Vehicles), Demountable Tanks, Tank-Containers, Tank Swap Bodies, Battery-Vehicles and Multiple-Element Gas Containers with Metallic Shells | ADR (Chapter 6.2.6), RID (Chapter 6.2.6), IMDG Code (Chapter 6.2.4), ICAO TI (Part 6 Chapter 5.4), IATA DGR (6.4.4) | ||
| Fibre-Reinforced Plastics (FRP) Fixed Tanks (Tank-Vehicles), Demountable Tanks, Tank-Containers and Tank Swap Bodies | ADR (Chapter 6.2.3), RID (Chapter 6.2.3), IMDG Code (Chapter 6.2.3), ICAO TI (Part 6 Chapter 5.1, 5.3), IATA DGR (6.4.1, 6.4.3) | ||
| Vacuum-Operated Waste Tanks | ADR (Chapter 6.2.2), RID (Chapter 6.2.2), IMDG Code (Chapter 6.2.2), ICAO TI (Part 6 Chapter 5.1, 5.2), IATA DGR (6.4.1, 6.4.2) | ||
| Bulk Containers (BK1 and BK2 Containers without CSC Approval) | ADR (Chapter 6.1), RID (Chapter 6.1), IMDG Code (Chapter 6.1), ICAO TI (Part 6 Chapter 1, 2, 3, 4), IATA DGR (6.0, 6.2, 6.3) | ||
| Tanks, Bulk Containers and Special Compartments for the Construction of Mobile Explosives Manufacturing Units | |||
| Inspection/Transport of Dangerous Goods | Dangerous Goods Transport Vehicles | ADR Vehicle Approval | ADR (Chapter 9) |
| Annual Technical Inspections | |||
| Inspection/Transport of Dangerous Goods | Transportable Pressure Equipment Used for the Transport of Dangerous Goods | Type Approval | 2010/35/AB Transportable Pressure Equipment Regulation, Chapter 3 Article 13 and Annex III |
| Pressure Cylinders | Initial Inspection | European Agreement concerning the International Carriage of Dangerous Goods by Road, ADR Chapters 6.2 and 6.8 | |
| Cylinders | Periodic Inspections | ||
| Gas Cartridges | Intermediate Inspections | ||
| Tanks/Tank-Containers | Exceptional Checks | ||
| Battery-Vehicles/Wagons | Reassessment of Conformity | ||
| Multiple-Element Gas Containers (MEGCs) and the Valves and Accessories of this Equipment | |||
| Inspection/Medical Radiation Applications | Digital Radiography (DR) | Tube voltage (kVp) | IPEM Report 32 |
| Tube output and stability | IPEM Report 91 | ||
| Exposure reproducibility and linearity | European Commission Radiation Protection No 162 | ||
| Exposure time | AAPM Report 74 | ||
| Half-value layer and tube filtration | AAPM Report 116 | ||
| Focal spot size | TS EN 61223-3-1 | ||
| X-ray/light field alignment and beam perpendicularity | TS EN 60336 | ||
| Grid alignment | TS EN 60601-1-3 | ||
| Tube housing leakage radiation | TS EN 60601-2-54 | ||
| Automatic exposure control | TS EN 62220-1 | ||
| Detector dose index (DDI) | |||
| Signal transfer characteristic | |||
| Noise | |||
| Visual assessment and measurement of uniformity | |||
| Defective detector element assessment | |||
| Assessment of blurring, line defects and loop artefacts | |||
| Loop artefact measurement | |||
| Image lag measurement | |||
| Threshold contrast-detail detectability | |||
| Noise variation with detector air kerma | |||
| Signal-to-noise ratio | |||
| High-contrast resolution | |||
| Scaling errors | |||
| Modulation transfer function (MTF) | |||
| Noise power spectrum (NPS) | |||
| Detective quantum efficiency (DQE) | |||
| Inspection/Medical Radiation Applications | Computed Radiography (CR) (Fixed, Mobile) | Tube voltage (kVp) | IPEM Report 32 |
| Tube output and stability | IPEM Report 91 | ||
| Exposure reproducibility and linearity | European Commission Radiation Protection No 162 | ||
| Exposure time | AAPM Report 74 | ||
| Half-value layer and tube filtration | AAPM Report 116 | ||
| Focal spot size | TS EN 61223-3-1 | ||
| X-ray/light field alignment and beam perpendicularity | TS EN 60336 | ||
| Grid alignment | TS EN 60601-1-3 | ||
| Tube housing leakage radiation | TS EN 60601-2-54 | ||
| Automatic exposure control | TS EN 62220-1 | ||
| Detector dose index (DDI) | |||
| Signal transfer characteristic | |||
| DDI reproducibility | |||
| Consistency of CR imaging plates | |||
| Assessment of differences between CR readers | |||
| Noise | |||
| Uniformity measurement | |||
| Erasure effectiveness | |||
| Threshold contrast-detail | |||
| Noise variation with detector air kerma | |||
| Signal-to-noise ratio | |||
| High-contrast resolution | |||
| Blurring | |||
| Laser function assessment | |||
| Scaling errors | |||
| Modulation transfer function (MTF) | |||
| Noise power spectrum (NPS) | |||
| Detective quantum efficiency (DQE) | |||
| Inspection/Medical Radiation Applications | Film-Screen Radiography (Fixed, Mobile) | Tube voltage (kVp) | IPEM Report 32 |
| Tube output and stability | IPEM Report 91 | ||
| Exposure reproducibility and linearity | European Commission Radiation Protection No 162 | ||
| Exposure time | AAPM Report 74 | ||
| Half-value layer and tube filtration | TS EN 61223-3-1 | ||
| Focal spot size | TS EN 60336 | ||
| X-ray/light field alignment and beam perpendicularity | TS EN 60601-1-3 | ||
| Grid alignment | TS EN 60601-2-54 | ||
| Tube housing leakage radiation | |||
| Automatic exposure control | |||
| Inspection/Medical Radiation Applications | Computed Tomography (CT) | Noise | IPEM Report 32 |
| High-contrast resolution | IPEM Report 91 | ||
| Modulation transfer function (MTF) | European Commission Radiation Protection No 162 | ||
| Linear dimensions and pixel size | AAPM Report 39 | ||
| CT number linearity | TS EN 61223-3-5 | ||
| CT number uniformity | TS EN 61223-2-6 | ||
| Low-contrast resolution | TS EN 60336 | ||
| Imaged slice thickness | TS EN 60601-2-44 | ||
| Irradiated slice thickness | IPEM Report 32 | ||
| Geometric efficiency | IPEM Report 91 | ||
| Computed tomography dose index (CTDI) | European Commission Radiation Protection No 162 | ||
| Tube output (CTDI measurement in air) | AAPM Report 39 | ||
| Focal spot size and alignment | TS EN 61223-3-5 | ||
| Tube voltage (kVp) | TS EN 61223-2-6 | ||
| Half-value layer and tube filtration | TS EN 60336 | ||
| Patient positioning lights | TS EN 60601-2-44 | ||
| -Alignment of internal and external scan plane lights | |||
| -Alignment of the scan plane light with the scan plane | |||
| -Coronal and sagittal plane lights | |||
| Table movement | |||
| -Accuracy of the table movement indicator | |||
| -Axial movement | |||
| -Helical movement | |||
| Gantry tilt | |||
| Scan Projection Radiograph (SPR) | |||
| – SPR imaging performance | |||
| – SPR dose in air | |||
| – SPR dose in a phantom | |||
| Inspection/Medical Radiation Applications | Mammography (Conventional) | Mammography system assessment | IPEM Report 89 |
| X-ray/light field alignment | IPEM Report 91 | ||
| X-ray/film field alignment | European Guidelines for Quality Assurance in Breast Cancer Screening and Diagnosis | ||
| Leakage radiation | European Commission Radiation Protection No 162 | ||
| Compression force | ACR Mammography QC Manual | ||
| Thickness indicator accuracy | NHSBSP No 63 | ||
| Focal spot size | IAEA HHS-2 | ||
| Tube voltage (kVp) | TS EN 61223-3-2 | ||
| Half-value layer and tube filtration | TS EN 60336 | ||
| Tube output | TS EN 60601-2-45 | ||
| -Tube output reproducibility | |||
| -Specific tube output | |||
| -Specific tube output rate | |||
| -Variation of tube output with tube voltage | |||
| -Variation of tube output with mAs | |||
| Grid factor | |||
| Grid artefact | |||
| Image uniformity | |||
| Automatic exposure control (AEC) | |||
| -Target optical density | |||
| -Reproducibility | |||
| -Variation with breast thickness | |||
| -Variation with tube voltage | |||
| -Exposure time | |||
| -Backup timer | |||
| Mean glandular dose | |||
| Clinical image quality | |||
| High-contrast resolution | |||
| Inspection/Medical Radiation Applications | Mammography (Digital) | Mammography system assessment | IPEM Report 89 |
| X-ray/light field alignment | IPEM Report 91 | ||
| Leakage radiation | European Guidelines for Quality Assurance in Breast Cancer Screening and Diagnosis | ||
| Compression force | European Commission Radiation Protection No 162 | ||
| Thickness indicator accuracy | ACR Mammography QC Manual | ||
| Focal spot size | NHSBSP No 63 | ||
| Tube voltage (kVp) | NHSBSP Equipment Report 0604 | ||
| Half-value layer and tube filtration | NHSBSP Equipment Report 0902 | ||
| Tube output | IAEA HHS-17 | ||
| -Tube output reproducibility | TS EN 61223-3-2 | ||
| -Specific tube output | TS EN 60336 | ||
| -Specific tube output rate | TS EN 60601-2-45 | ||
| -Variation of tube output with tube voltage | TS EN 62220-1-2 | ||
| -Variation of tube output with mAs | IPEM Report 89 | ||
| Grid factor | IPEM Report 91 | ||
| Grid artefact | European Guidelines for Quality Assurance in Breast Cancer Screening and Diagnosis | ||
| Image uniformity | European Commission Radiation Protection No 162 | ||
| Automatic exposure control (AEC) | ACR Mammography QC Manual | ||
| -Target optical density | NHSBSP No 63 | ||
| -Reproducibility | NHSBSP Equipment Report 0604 | ||
| -Variation with breast thickness | NHSBSP Equipment Report 0902 | ||
| -Variation with tube voltage | IAEA HHS-17 | ||
| -Exposure time | TS EN 61223-3-2 | ||
| -Backup timer | TS EN 60336 | ||
| Mean glandular dose | TS EN 60601-2-45 | ||
| Clinical image quality | TS EN 62220-1-2 | ||
| High-contrast resolution | |||
| Modulation transfer function (MTF) | |||
| Noise power spectrum (NPS) | |||
| Detective quantum efficiency (DQE) | |||
| Inspection/Medical Radiation Applications | Fluoroscopy (Conventional) (DSA Angiography, Cardiac Angiography, C-arm, Gastrointestinal Table) | Tube voltage (kVp) | IPEM Report 32 |
| Tube output | IPEM Report 91 | ||
| Half-value layer and tube filtration | European Commission Radiation Protection No 162 | ||
| Patient entrance dose | AAPM Report 70 | ||
| Maximum exposure rate | AAPM Report 74 | ||
| Image intensifier entrance dose | TS EN 61223-3-3 | ||
| Automatic brightness control | TS EN 60601-2-43 | ||
| X-ray beam collimation | TS EN 60336 | ||
| Field size and distortion | |||
| Greyscale test | |||
| High-contrast resolution | |||
| Low-contrast resolution | |||
| Threshold contrast-detail detectability | |||
| Inspection/Medical Radiation Applications | Fluoroscopy (Digital) (DSA Angiography, Cardiac Angiography) | Tube voltage (kVp) | IPEM Report 32 |
| Tube output | IPEM Report 91 | ||
| Half-value layer and tube filtration | European Commission Radiation Protection No 162 | ||
| Patient entrance dose | AAPM Report 70 | ||
| Maximum exposure rate | AAPM Report 74 | ||
| Image intensifier entrance dose | TS EN 61223-3-3 | ||
| Automatic brightness control | TS EN 60601-2-43 | ||
| X-ray beam collimation | TS EN 60336 | ||
| Field size and distortion | TS EN 62220-1-3 | ||
| Greyscale test | |||
| High-contrast resolution | |||
| Low-contrast resolution | |||
| Threshold contrast-detail detectability | |||
| Modulation transfer function (MTF) | |||
| Noise power spectrum (NPS) | |||
| Detective quantum efficiency (DQE | |||
| Inspection/Medical Radiation Applications | Intraoral Dental Radiography (Conventional, Digital) | Tube voltage (kVp) | IPEM Report 91 |
| Exposure time | European Commission Radiation Protection No 162 | ||
| Tube output | NRPB Guidance Notes for Dental Practitioners on the Safe Use of X-Ray Equipment | ||
| Half-value layer and tube filtration | BIR – Assurance of Quality in the Diagnostic Imaging Department | ||
| X-ray beam size | TS EN 61223-3-4 | ||
| Image uniformity | TS EN 60336 | ||
| Limiting spatial resolution | |||
| Dose measurement at the collimator exit | |||
| Inspection/Medical Radiation Applications | Panoramic Dental Radiography (Conventional, Digital) | Tube voltage (kVp) | IPEM Report 91 |
| Exposure time | European Commission Radiation Protection No 162 | ||
| Tube output | NRPB Guidance Notes for Dental Practitioners on the Safe Use of X-Ray Equipment | ||
| Half-value layer and tube filtration | BIR – Assurance of Quality in the Diagnostic Imaging Department | ||
| X-ray beam size | TS EN 61223-3-4 | ||
| Image reproducibility and uniformity | TS EN 60336 | ||
| X-ray beam alignment | |||
| Synchronisation of exposure with tube movement | |||
| Dose-area product (DAP) measurement | |||
| Inspection/Medical Radiation Applications | Dental Computed Tomography | Tube output reproducibility | IPEM Report 32 |
| Tube output stability | IPEM Report 91 | ||
| Tube voltage (kVp) | European Commission Radiation Protection No 172 | ||
| Half-value layer and tube filtration | European Commission Radiation Protection No 162 | ||
| X-ray beam size | NRPB Guidance Notes for Dental Practitioners on the Safe Use of X-Ray Equipment | ||
| X-ray beam alignment | BIR – Assurance of Quality in the Diagnostic Imaging Department | ||
| Tube housing leakage radiation | AAPM Report 39 | ||
| Computed tomography dose index (CTDI) | TS EN 61223-3-4 | ||
| Dose-area product (DAP) measurement | TS EN 60336 | ||
| CT number accuracy | TS EN 61223-3-5 | ||
| Contrast-detail assessment | TS EN 61223-2-6 | ||
| Image uniformity and artefact assessment | |||
| Noise | |||
| High-contrast resolution | |||
| Modulation transfer function (MTF) | |||
| Geometric accuracy | |||
| Inspection/Medical Radiation Applications | Bone Mineral Densitometer | Bone mineral density accuracy | European Commission Radiation Protection No 162 |
| Inspection/Medical Radiation Applications | Film Processing System and Darkroom (Radiography, Mammography) | Film-screen contact | IPEM Report 32 |
| Visual inspection of cassettes and screens | IPEM Report 89 | ||
| Relative screen speeds | IPEM Report 91 | ||
| Developer temperature | European Guidelines for Quality Assurance in Breast Cancer Screening and Diagnosis | ||
| Film characteristic curve | European Commission Radiation Protection No 162 | ||
| Base plus fog | ACR Mammography QC Manual | ||
| Film speed index | |||
| Contrast index | |||
| Replenishment rate | |||
| Developer and fixer pH measurement | |||
| Darkroom safelight | |||
| Darkroom light leakage | |||
| Inspection/Medical Radiation Applications | Medical Monitor and Laser Printer Systems | Visual inspection of the monitor | IPEM Report 91 |
| Monitor greyscale inspection | European Commission Radiation Protection No 162 | ||
| Monitor length and angle calibration | AAPM Report OR-03 | ||
| Monitor resolution | |||
| Monitor uniformity | |||
| DICOM greyscale calibration | |||
| Differences between monitors | |||
| Printer calibration | |||
| Printer optical density stability | |||
| Printer image quality | |||
| Inspection/Medical Radiation Applications | X-Ray Film Viewer | Visual inspection | IPEM Report 91 |
| Luminance | BIR – Assurance of Quality in the Diagnostic Imaging Department | ||
| Uniformity | |||
| Differences between film viewers | |||
| Inspection/Medical Radiation Applications | Viewing Conditions | Room lighting | IPEM Report 91 |
| Inspection/Medical Radiation Applications | Magnetic Resonance (MR) Imaging | Magnetic field homogeneity | ACR MRI QC Manual |
| Geometric accuracy | AAPM Report 28 | ||
| High-contrast resolution | AAPM Report 34 | ||
| Slice thickness accuracy | AAPM Report 100 | ||
| Slice position accuracy | NEMA MS-1 | ||
| Signal-to-noise ratio (SNR) | NEMA MS-5 | ||
| Image uniformity | TS EN 62464-1 | ||
| Signal ghosting | |||
| Low-contrast detectability | |||
| Inspection/Medical Radiation Applications | Ultrasound (Greyscale) | Physical and mechanical examination | IPEM Report 102 |
| Monitor adjustment and accuracy | AAPM Report 65 | ||
| Image uniformity | |||
| Penetration (imaging) depth | |||
| Distance accuracy | |||
| Anechoic object imaging | |||
| Axial resolution | |||
| Lateral resolution | |||
| Dead zone | |||
| Inspection/Medical Radiation Applications | Doppler Ultrasound | Physical and mechanical examination | IPEM Report 102 |
| Monitor adjustment and accuracy | AAPM Report 65 | ||
| Image uniformity | Gammex 1430 LE User’s Guide | ||
| Penetration (imaging) depth | |||
| Distance accuracy | |||
| Anechoic object imaging | |||
| Axial resolution | |||
| Lateral resolution | |||
| Dead zone | |||
| Doppler signal sensitivity | |||
| Colour Doppler flow sensitivity | |||
| Deep flow sensitivity | |||
| Colour Doppler–B-mode image alignment | |||
| Flow direction accuracy | |||
| Flow velocity reading accuracy | |||
| Sample gate position accuracy | |||
| Inspection/Medical Radiation Applications | Echocardiography | Physical and mechanical examination | IPEM Report 102 |
| Monitor adjustment and accuracy | AAPM Report 65 | ||
| Image uniformity | Gammex 1430 LE User’s Guide | ||
| Penetration (imaging) depth | |||
| Distance accuracy | |||
| Anechoic object imaging | |||
| Axial resolution | |||
| Lateral resolution | |||
| Dead zone | |||
| Doppler signal sensitivity | |||
| Colour Doppler flow sensitivity | |||
| Deep flow sensitivity | |||
| Colour Doppler–B-mode image alignment | |||
| Flow direction accuracy | |||
| Flow velocity reading accuracy | |||
| Sample gate position accuracy | |||
| Inspection/Medical Radiation Applications | Gamma Camera | Intrinsic spatial resolution | NEMA NU-1 |
| Intrinsic spatial linearity | IAEA HHS-6 | ||
| Intrinsic energy resolution | IAEA TECDOC-602 | ||
| Intrinsic Uniformity | IAEA Quality Control Atlas for Scintillation Camera Systems | ||
| Intrinsic uniformity in narrowed and asymmetric energy windows | TS EN 61948-2 | ||
| Intrinsic count rate performance in air | TS EN 60789 | ||
| Intrinsic spatial resolution at a count rate of 75 kcps | TS EN 61675-3 | ||
| Intrinsic uniformity at a count rate of 75 kcps | |||
| System (extrinsic) uniformity | |||
| System spatial resolution | |||
| System spatial resolution (with scatter) | |||
| System planar sensitivity and penetration | |||
| Detector shielding | |||
| System count rate performance (with scatter) | |||
| Collimator hole alignment | |||
| Whole-body scanning system spatial resolution | |||
| Inspection/Medical Radiation Applications | Single Photon Emission Computed Tomography (SPECT) | Intrinsic spatial resolution | NEMA NU-1 |
| Intrinsic spatial linearity | IAEA HHS-6 | ||
| Intrinsic energy resolution | IAEA TECDOC-602 | ||
| Intrinsic Uniformity | IAEA Quality Control Atlas for Scintillation Camera Systems | ||
| Intrinsic uniformity in asymmetric energy windows | TS EN 61948-2 | ||
| Intrinsic count rate performance in air | TS EN 60789 | ||
| Intrinsic spatial resolution at a count rate of 75 kcps | TS EN 61675-2 | ||
| Uniformity at a count rate of 75 kcps | TS EN 61675-3 | ||
| System (extrinsic) uniformity | |||
| System spatial resolution | |||
| System spatial resolution (with scatter) | |||
| System planar sensitivity and penetration | |||
| Detector shielding | |||
| System count rate performance (with scatter) | |||
| Collimator hole alignment | |||
| Whole-body scanning system spatial resolution | |||
| System alignment (COR) | |||
| SPECT spatial resolution | |||
| SPECT spatial resolution (with scatter) | |||
| System volume sensitivity | |||
| Variation of sensitivity and uniformity with angle | |||
| Sensitivity difference between detectors | |||
| Overall tomographic system performance | |||
| – Tomographic noise | |||
| – Tomographic uniformity | |||
| – Tomographic contrast | |||
| Inspection/Medical Radiation Applications | Single Photon Emission Computed Tomography / Computed Tomography (SPECT/CT) | Intrinsic spatial resolution | NEMA NU-1 |
| Intrinsic spatial linearity | IAEA HHS-6 | ||
| Intrinsic energy resolution | IAEA TECDOC-602 | ||
| Intrinsic Uniformity | IAEA Quality Control Atlas for Scintillation Camera Systems | ||
| Intrinsic uniformity in asymmetric energy windows | IPEM Report 32 | ||
| Intrinsic count rate performance in air | IPEM Report 91 | ||
| Intrinsic spatial resolution at a count rate of 75 kcps | European Commission Radiation Protection No 162 | ||
| Uniformity at a count rate of 75 kcps | AAPM Report 39 | ||
| System (extrinsic) uniformity | TS EN 61948-2 | ||
| System spatial resolution | TS EN 60789 | ||
| System spatial resolution (with scatter) | TS EN 61675-2 | ||
| System planar sensitivity and penetration | TS EN 61675-3 | ||
| Detector shielding | TS EN 61223-3-5 | ||
| System count rate performance (with scatter) | TS EN 61223-2-6 | ||
| Collimator hole alignment | TS EN 60336 | ||
| Whole-body scanning system spatial resolution | TS EN 60601-2-44 | ||
| System Alignment (COR) | |||
| SPECT spatial resolution | |||
| SPECT spatial resolution (with scatter) | |||
| System volume sensitivity | |||
| Variation of sensitivity and uniformity with angle | |||
| Sensitivity differences between detectors | |||
| Overall tomographic system performance | |||
| -Tomographic uniformity | |||
| -Tomographic noise | |||
| -Tomographic contrast | |||
| Noise | |||
| Inspection/Medical Radiation Applications | Positron Emission Tomography (PET) | Spatial resolution | NEMA NU-2 |
| Scatter fraction measurement | IAEA HHS-1 | ||
| Count loss measurement | TS EN 61948-3 | ||
| Random event measurement | TS EN 61675-1 | ||
| Sensitivity | |||
| Energy resolution | |||
| Accuracy of count loss and random event corrections | |||
| Accuracy of attenuation and scatter corrections | |||
| Image quality | |||
| Inspection/Medical Radiation Applications | Positron Emission Tomography / Computed Tomography (PET/CT) | Spatial resolution | NEMA NU-2 |
| Scatter fraction measurement | IAEA HHS-1 | ||
| Count loss measurement | IPEM Report 32 | ||
| Random event measurement | IPEM Report 91 | ||
| Sensitivity | European Commission Radiation Protection No 162 | ||
| Energy resolution | AAPM Report 39 | ||
| Accuracy of count loss and random event corrections | TS EN 61948-3 | ||
| Accuracy of attenuation and scatter corrections | TS EN 61675-1 | ||
| Image quality | TS EN 61223-3-5 | ||
| Noise | TS EN 61223-2-6 | ||
| High-contrast resolution | TS EN 60336 | ||
| Modulation transfer function (MTF) | TS EN 60601-2-44 | ||
| Linear dimensions and pixel size | |||
| CT number values and linearity | |||
| CT number uniformity | |||
| Low-contrast resolution | |||
| Imaged slice thickness | |||
| Irradiated slice thickness | |||
| Geometric efficiency | |||
| Computed tomography dose index (CTDI) | |||
| Tube output (CTDI measurement in air) | |||
| Focal spot size and alignment | |||
| Tube voltage (kVp) | |||
| Inspection/Medical Radiation Applications | Dose Calibrator | High voltage | IAEA TECDOC-602 |
| Zero adjustment | IAEA TRS-454 | ||
| Clock accuracy | TS EN 61948-4 | ||
| Background measurement | |||
| Check source response (stability) | |||
| Accuracy | |||
| Precision | |||
| Relative response | |||
| Linearity | |||
| Inspection/Medical Radiation Applications | Gamma Probe System | Sensitivity | NEMA NU-3 |
| Sensitivity in a scattering medium | IAEA TECDOC-602 | ||
| Sensitivity through side shielding | TS EN 61948-1 | ||
| Sensitivity to scattered radiation | |||
| Spatial resolution in a scattering medium | |||
| Volume sensitivity to activity distributed in a scattering medium | |||
| Short-term sensitivity stability (Chi-square test) | |||
| Count rate capability in a scattering medium | |||
| Angular resolution in a scattering medium | |||
| Energy resolution | |||
| Side and rear shielding | |||
| Inspection/Medical Radiation Applications | Thyroid Uptake System | Energy calibration | IAEA TECDOC-602 |
| Energy resolution | TS EN 61948-1 | ||
| Sensitivity | |||
| Counting precision (Chi-square test) | |||
| Background count rate | |||
| Activity response linearity | |||
| Inspection/Medical Radiation Applications | Well-Type Gamma Counter | Energy calibration | IAEA TECDOC-602 |
| Energy resolution | TS EN 61948-1 | ||
| Sensitivity | |||
| Counting precision (Chi-square test) | |||
| Background count rate | |||
| Activity response linearity | |||
| Inspection/Natural Gas Installations/Natural Gas Distribution Sector | 20.2.1. Natural Gas Distribution Network | 20.2.A. Design and Construction Project Check | Natural Gas Market Law No. 4646 |
| 20.2.B. Construction Process Check | Regulations, Communiqués and Board Decisions of the Republic of Türkiye Energy Market Regulatory Authority (EPDK) | ||
| 20.2.C. Post-Construction Conformity Check | EPDK Specification and Contract for the Licensed Area | ||
| Regulation on the Production of Large-Scale Map Information | |||
| TS 6565 | |||
| Inspection/Natural Gas Installations/Natural Gas Distribution Sector | 20.2.2. Type A and B RMS Stations | 20.2.A. Design and Construction Project Check | Natural Gas Market Law No. 4646 |
| 20.2.B. Construction Process Check | Regulations, Communiqués and Board Decisions of the Republic of Türkiye Energy Market Regulatory Authority (EPDK) | ||
| 20.2.C. Post-Construction Conformity Check | EPDK Specification and Contract for the Licensed Area | ||
| TS EN 334 | |||
| TS 5826 | |||
| API 6D | |||
| Inspection/Natural Gas Installations/Natural Gas Distribution Sector | 20.2.3. Infrastructure Information Systems and GIS Applications | 20.2.A. Design and Construction Project Check | Natural Gas Market Law No. 4646 |
| 20.2.B. Construction Process Check | Regulations, Communiqués and Board Decisions of the Republic of Türkiye Energy Market Regulatory Authority (EPDK) | ||
| 20.2.C. Post-Construction Conformity Check | EPDK Specification and Contract for the Licensed Area | ||
| Regulation on the Production of Large-Scale Map Information | |||
| Inspection/Natural Gas Installations/Natural Gas Distribution Sector | 20.2.4. Natural Gas Service Lines and Service Regulators | 20.2.A. Design and Construction Project Check | Natural Gas Market Law No. 4646 |
| 20.2.B. Construction Process Check | Regulations, Communiqués and Board Decisions of the Republic of Türkiye Energy Market Regulatory Authority (EPDK) | ||
| 20.2.C. Post-Construction Conformity Check | EPDK Specification and Contract for the Licensed Area | ||
| TS 10624 | |||
| TS EN 15266 | |||
| TS EN 1555 | |||
| Inspection/Natural Gas Installations/Natural Gas Distribution Sector | 20.2.5. Cathodic Protection and SCADA (Dispatch Control Centre) Systems | 20.2.A. Design and Construction Project Check | Natural Gas Market Law No. 4646 |
| 20.2.B. Construction Process Check | Regulations, Communiqués and Board Decisions of the Republic of Türkiye Energy Market Regulatory Authority (EPDK) | ||
| 20.2.C. Post-Construction Conformity Check | EPDK Specification and Contract for the Licensed Area | ||
| Inspection/Natural Gas Installations/Natural Gas Distribution Sector | 20.2.6 Natural Gas Steel and Polyethylene Pipelines | 20.2.A. Design and Construction Project Check | Natural Gas Market Law No. 4646 |
| 20.2.B. Construction Process Check | Regulations, Communiqués and Board Decisions of the Republic of Türkiye Energy Market Regulatory Authority (EPDK) | ||
| 20.2.C. Post-Construction Conformity Check | EPDK Specification and Contract for the Licensed Area | ||
| TS EN 10204 | |||
| TS EN 1555 | |||
| TS EN ISO 15607 | |||
| TS EN ISO 15609-1 | |||
| TS EN ISO 17636-1 | |||
| ANSI/ASME B 31.8 | |||
| API 1104 | |||
| API RP 1110 | |||
| API 6D | |||
| API 5L | |||
| DIN 30670 | |||
| Inspection/Natural Gas Installations/Internal Natural Gas Installations | 20.1. Apartment Internal Installation | 20.D. Periodic Inspection | Republic of Türkiye Energy Market Regulatory Authority (EPDK) Internal Installations Regulation |
| 20.2. Building Riser Installation | TS 7363 | ||
| 20.3. Boiler Room Installation | |||
| 20.4 Industrial and High-Consumption Internal Installations | |||
| Inspection/Natural Gas Installations/Internal Natural Gas Installations | 20.1. Apartment Internal Installation | 20.C. Manufacturing and Installation Process Check | Republic of Türkiye Energy Market Regulatory Authority (EPDK) Internal Installations Regulation |
| 20.2. Building Riser Installation | TS 7363 | ||
| 20.3. Boiler Room Installation | |||
| 20.4 Industrial and High-Consumption Internal Installations | |||
| Inspection/Natural Gas Installations/Internal Natural Gas Installations | 20.1. Apartment Internal Installation | 20.B. Initial Inspection | Republic of Türkiye Energy Market Regulatory Authority (EPDK) Internal Installations Regulation |
| 20.2. Building Riser Installation | TS 7363 | ||
| 20.3. Boiler Room Installation | |||
| 20.4 Industrial and High-Consumption Internal Installations | |||
| Inspection/Natural Gas Installations/Internal Natural Gas Installations | 20.1. Apartment Internal Installation | 20.A. Project Review and Approval | Republic of Türkiye Energy Market Regulatory Authority (EPDK) Internal Installations Regulation |
| 20.2. Building Riser Installation | TS 7363 | ||
| 20.3. Boiler Room Installation | |||
| 20.4 Industrial and High-Consumption Internal Installations | |||
| Inspection/Facilities with an Explosive Atmosphere Hazard | Electrical Equipment and Installations Used in Explosive Atmospheres | Checking design, selection and installation conformity with the explosive atmosphere classification | |
| Verification of the declared explosive atmosphere classification | |||
| TS EN 60079-14 | |||
| Inspection/Door and Window Systems | Door and Window Systems | Inspection of Factory Production Control | TS EN 14351-1 Clause:7.3 |
| Inspection/Measuring Instruments/Water Meters | 23.1. Water Meters | 23.A. Initial Inspection | Regulation on Measuring Instruments and Metrological Control Methods |
| Regulation on the Inspection of Measures and Measuring Instruments | |||
| Regulation on the Stamping of Measures and Measuring Instruments | |||
| Inspection/Measuring Instruments/Gas Meters and Volume Conversion Devices | 23.2. Gas Meters and Volume Conversion Devices | 23.A. Initial Inspection | Regulation on Measuring Instruments and Metrological Control Methods |
| Regulation on the Inspection of Measures and Measuring Instruments | |||
| Regulation on the Stamping of Measures and Measuring Instruments | |||
| Inspection/Measuring Instruments/Active Electrical Energy Meters | 23.3. Electricity Meters | 23.A. Initial Inspection | Regulation on Measuring Instruments and Metrological Control Methods |
| Regulation on the Inspection of Measures and Measuring Instruments | |||
| Regulation on the Stamping of Measures and Measuring Instruments | |||
| Inspection/Measuring Instruments/Heat Meters | 23.4. Heat Meters | 23.A. Initial Inspection (where no type approval amendment is needed after repair) | Regulation on the Stamping of Measures and Measuring Instruments |
| DN 15-DN 40 | 23.B. Periodic Inspection | Heat Meter Inspection Regulation | |
| 23.C. Complaint Inspection | |||
| 23.D. Stock Inspection | |||
| Inspection/Measuring Instruments/Instrument Transformers | Current Transformers | Inspection of Class (Ratio/Phase) Errors | Regulation on the Stamping of Measures and Measuring Instruments |
| Voltage Transformers | Current and Voltage Transformer Inspection Regulation | ||
| TS EN 61869-1 | |||
| TS EN 61869-2 | |||
| TS EN 61869-3 | |||
| TS EN 61869-5 | |||
| Inspection/Measuring Instruments/Speed Detection Devices (RADAR) | 23.6. Speed Measuring Devices (RADAR) | Periodic Inspection | Regulation on the Inspection of Speed Violation Detection Equipment |
| Inspection/Measuring Instruments/Instruments for Measuring the Air Pressure of Motor Vehicle Tyres (Tyre Pressure Gauges) | 23.7 Instruments for Measuring the Air Pressure of Motor Vehicle Tyres (Tyre Pressure Gauges) | Initial Inspection | TS EN 12645 |
| Inspection/Measuring Instruments/Compressed Natural Gas (CNG) Measuring Systems | 23.8 Compressed Natural Gas (CNG) Measuring Systems | Initial Inspection | Regulation on the Inspection of Measuring Systems for Liquids Other Than Water and Certain Measuring and Weighing Instruments |
| Periodic Inspection | |||
| Stock Inspection | |||
| Inspection/Hygiene-Sanitation/Food Process Hygiene-Sanitation Inspection/Food Production and Processing Facilities/Plant-Based Food | Food Manufacturing and Processing Facilities | Food Process Hygiene-Sanitation Inspection | Food Hygiene Regulation |
| Plant-Based Food | Codex Alimentarius CAC/RCP 1-1969 | ||
| TS 13027 | |||
| APHA Compendium of Methods for The Microbiological Examination of Foods, 4th Edition, Chapter 2-Sampling Plans, Sample Collection, Shipment, and Preparation for Analysis, | |||
| APHA Compendium of Methods for The Microbiological Examination of Foods, 4th Edition, Chapter 3- Microbiological Monitoring of the Food Processing Environment, | |||
| ISO 18593 | |||
| ISO 19458 | |||
| Inspection/Hygiene-Sanitation/Food Process Hygiene-Sanitation Inspection/Catering Establishments | Catering establishments | Food Process Hygiene-Sanitation Inspection | Food Hygiene Regulation |
| Inspection/Hygiene-Sanitation/Food Process Hygiene-Sanitation Inspection/Food Preparation and Service Areas | Food Preparation and Service Areas | Regulation on Specific Hygiene Rules for Food of Animal Origin | |
| Regulation Laying Down Specific Rules for Official Controls of Food of Animal Origin | |||
| Codex Alimentarius CAC/RCP 1-1969 | |||
| TS 13027 | |||
| APHA Compendium of Methods for The Microbiological Examination of Foods, 4th Edition, Chapter 2-Sampling Plans, Sample Collection, Shipment, and Preparation for Analysis, | |||
| APHA Compendium of Methods for The Microbiological Examination of Foods, 4th Edition, Chapter 3- Microbiological Monitoring of the Food Processing Environment, | |||
| ISO 18593 | |||
| ISO 19458 | |||
| Inspection/Hygiene-Sanitation/Food Process Hygiene-Sanitation Inspection/Food Storage, Distribution and Sales Premises | Food Storage, Distribution and Sales Premises | Food Process Hygiene-Sanitation Inspection | Food Hygiene Regulation |
| Codex Alimentarius CAC/RCP 1-1969 | |||
| Codex Alimentarius CAC/RCP 39-1993 | |||
| TS 13027 | |||
| APHA Compendium of Methods for The Microbiological Examination of Foods, 4th Edition, Chapter 2-Sampling Plans, Sample Collection, Shipment, and Preparation for Analysis, | |||
| APHA Compendium of Methods for The Microbiological Examination of Foods, 4th Edition, Chapter 3- Microbiological Monitoring of the Food Processing Environment, | |||
| ISO 18593 | |||
| ISO 19458 | |||
| Inspection/Hygiene-Sanitation/Food Process Hygiene-Sanitation Inspection/Manufacturers of Food Contact Substances and Materials | Manufacturers of Food Contact Substances and Materials | Food Process Hygiene-Sanitation Inspection | Food Hygiene Regulation |
| Turkish Food Codex — Regulation on Food Contact Substances and Materials | |||
| Codex Alimentarius CAC/RCP 1-1969 | |||
| TS 13027 | |||
| APHA Compendium of Methods for The Microbiological Examination of Foods, 4th Edition, Chapter 2-Sampling Plans, Sample Collection, Shipment, and Preparation for Analysis, | |||
| APHA Compendium of Methods for The Microbiological Examination of Foods, 4th Edition, Chapter 3- Microbiological Monitoring of the Food Processing Environment, | |||
| ISO 18593 | |||
| ISO 19458 | |||
| Inspection/Hygiene-Sanitation/Non-Food Hygiene-Sanitation Inspection/Tourism Facilities and Recreational Areas | Hotels | Non-Food Hygiene-Sanitation Inspection | Regulation on the Certification and Qualifications of Tourism Facilities |
| Tourism Facilities | Communiqué on Implementation of the Regulation on the Certification and Qualifications of Tourism Facilities | ||
| Recreational Areas | |||
| Inspection/Hygiene-Sanitation/Non-Food Hygiene-Sanitation Inspection/Cosmetics Production Areas | Cosmetics Production Areas | Non-Food Hygiene-Sanitation Inspection | Cosmetics Regulation |
| ISO 22716 | |||
| Cosmetics Good Manufacturing Practice (GMP) Guidelines | |||
| Inspection/Hygiene-Sanitation/Non-Food Hygiene-Sanitation Inspection/Feed Businesses | Feed Businesses | Non-Food Hygiene-Sanitation Inspection | Feed Hygiene Regulation |
| Regulation on Sampling and Analysis Methods for the Official Control of Feed | |||
| Good Manufacturing Practice and Feed Hygiene Guidelines for the Feed Sector | |||
| Inspection/Hygiene-Sanitation/Legionella and Swimming Pool Inspection | Hotels | Swimming Pool Inspection | Regulation on the Certification and Qualifications of Tourism Facilities |
| Tourism Facilities | Regulation on the Health Principles and Conditions Applicable to Swimming Pools | ||
| Recreational Areas | Who 2006 Guidelines For Safe Recreational Water Environments (Volume 2-Swimming Pools And Similar Environments) | ||
| ISO 19458 | |||
| Codex Alimentarius CAC/RCP:33-1985 | |||
| Inspection/Hygiene-Sanitation/Legionella and Swimming Pool Inspection | Hotels, Tourism Facilities and Recreational Areas | Legionella Inspection | Legionnaires’ Disease Control Programme Guidelines 2015 |
| Travel-Associated Legionnaires’ Disease Control Programme Circular 2001/34 | |||
| Regulation on Procedures and Principles for the Control of Legionnaires’ Disease | |||
| Ewgli 2005 European Guidelines For Control And Prevention Of Travel Associated Legionnaires’ Disease | |||
| Who 2007 Legionella And The Prevention Of Legionellosis | |||
| Inspection/Playgrounds and Sports Equipment | 9.1. Swings | ||
| Post-installation inspection | TS EN 1176-1 | ||
| Annual main inspection | TS EN 1176-1/D1 | ||
| Operational inspection | TS EN 1176-2 | ||
| TS EN 1176-7 | |||
| TS EN 1177 | |||
| Inspection/Playgrounds and Sports Equipment | 9.2. Slides | ||
| Post-installation inspection | TS EN 1176-1 | ||
| Annual main inspection | TS EN 1176-1/D1 | ||
| Operational inspection | TS EN 1176-3 | ||
| TS EN 1176-3/D1 | |||
| TS EN 1176-7 | |||
| TS EN 1177 | |||
| Inspection/Playgrounds and Sports Equipment | 9.3. Cableways | ||
| Post-installation inspection | TS EN 1176-1 | ||
| Annual main inspection | TS EN 1176-1/D1 | ||
| Operational inspection | TS EN 1176-4 | ||
| TS EN 1176-7 | |||
| TS EN 1177 | |||
| Inspection/Playgrounds and Sports Equipment | 9.4. Carousels | ||
| Post-installation inspection | TS EN 1176-1 | ||
| Annual main inspection | TS EN 1176-1/D1 | ||
| Operational inspection | TS EN 1176-5 | ||
| TS EN 1176-7 | |||
| TS EN 1177 | |||
| Inspection/Playgrounds and Sports Equipment | 9.5. Rocking Equipment | ||
| Post-installation inspection | TS EN 1176-1 | ||
| Annual main inspection | TS EN 1176-1/D1 | ||
| Operational inspection | TS EN 1176-6 | ||
| TS EN 1176-7 | |||
| TS EN 1177 | |||
| Inspection/Playgrounds and Sports Equipment | 9.6. Fully Enclosed Play Equipment | ||
| Post-installation inspection | TS EN 1176-1 | ||
| Annual main inspection | TS EN 1176-1/D1 | ||
| Operational inspection | TS EN 1176-10 | ||
| TS EN 1176-7 | |||
| TS EN 1177 | |||
| Inspection/Playgrounds and Sports Equipment | 9.7. Spatial nets | ||
| Post-installation inspection | TS EN 1176-1 | ||
| Annual main inspection | TS EN 1176-1/D1 | ||
| Operational inspection | TS EN 1176-11 | ||
| TS EN 1176-7 | |||
| TS EN 1177 | |||
| Inspection/Playgrounds and Sports Equipment | 9.8. Ropes | ||
| A. Periodic Inspection | Recreation Areas Regulation | ||
| B. Initial Inspection | Communiqué on Implementation for Recreation Areas | ||
| TS EN 15567-1 | |||
| TS EN 15567-2 | |||
| Inspection/Playgrounds and Sports Equipment | 9.9. Artificial Climbing Structures | ||
| A. Periodic Inspection | TS EN 12572-1 | ||
| B. Initial Inspection | TS EN 12572-2 | ||
| Inspection/Playgrounds and Sports Equipment | 9.10. Permanently Installed Outdoor Fitness Equipment | ||
| A. Periodic Inspection | TS EN 1176-1 | ||
| B. Initial Inspection | TS EN 1176-1/D1 | ||
| TS EN 1177 | |||
| TS EN 16630 | |||
| Inspection/Playgrounds and Sports Equipment | 9.11. Water Slides | ||
| A. Periodic Inspection | TS EN 1069-1 | ||
| B. Initial Inspection | TS EN 1069-2 | ||
| Inspection/Chimneys | 21. Chimneys | 21.A. Periodic Inspection | TS EN 13384-1 |
| TS EN 13384-2 | |||
| TS EN 15287-1 | |||
| TS EN 15287-2 | |||
| TS 7363 | |||
| TS EN 13384-1+A1 | |||
| TS EN 13384-2+A1 | |||
| TS EN 15287-1+A1 | |||
| Inspection/Chimneys | 21. Chimneys | 21.B. Leak Tests | TS EN 15287-1+A1 |
| TS EN 15287-2 | |||
| TS 7363 | |||
| Inspection/Chimneys | 21. Chimneys | 21.C. Design and Installation Conformity Inspection | TS EN 13384-1 |
| TS EN 13384-2 | |||
| TS EN 15287-1 | |||
| TS EN 15287-2 | |||
| TS 7363 | |||
| TS EN 13384-1+A1 | |||
| TS EN 13384-2+A1 | |||
| TS EN 15287-1+A1 | |||
| Inspection/Electrical/Power Generation Plants | Grid-Connected Photovoltaic Systems | Periodic Inspection | TS EN 62446-1 |
| Thermographic Inspection | IEC 62446-1 | ||
| IV Measurement and Degradation Analysis | IEC 62446-3 | ||
| TS EN 61724 | |||
| Inspection/Electrical/Power Generation Plants | Ancillary Services | Periodic Inspection | Electricity Market Grid Regulation |
| Primary Frequency Control | |||
| Reactive Power Control | |||
| Synchronous Compensation | |||
| Inspection/Electrical/Power Generation Plants | Grid-Connected Photovoltaic Systems | Manufacturing Process Check | IEC 62941 |
| Photovoltaic (PV) Modules | TS EN 61215 | ||
| Inverters | TS EN 61646 | ||
| Solar Cables | TS EN 61730-1 | ||
| TS EN 61730-2 | |||
| Inspection/Electrical/Power Generation Plants | Grid-Connected Photovoltaic Systems | Initial Verification and Inspection | TS EN 62446-1 |
| Design Verification | IEC 62446-1 | ||
| Installed Capacity Determination and Verification | IEC 62548 | ||
| Thermographic Inspection | IEC 60364-6 | ||
| IV Measurement | TS EN 61724 | ||
| Installation and assembly inspection | IEC 62446-3 | ||
| Inspection/Electrical/Power Generation Plants | Grid-Connected Photovoltaic Systems | Pre-Loading Transport | TS EN 62759-1 |
| Photovoltaic (PV) Modules | Storage Check | IEC 62759-1 | |
| Supervision of Transport and Shipment of Module Packaging Units | IEC 62759-2 | ||
| Inspection/Electrical/Power Generation Plants | Grid-Connected Photovoltaic Systems | Energy Generation Analysis | TS EN 61724 |
| Technology Selection | |||
| Energy Generation Analysis | |||
| Inspection/Electrical/Cathodic Protection | 6.A.2.1. Buried Metallic Tanks and Associated Piping | 6.A. Periodic Inspection | TS EN 13509 |
| TS EN 13636 | |||
| Inspection/Electrical/Cathodic Protection | 6.A.2.2.1. Buried Metallic Pipelines | 6.A. Periodic Inspection | TS EN 13509 |
| 6.A.2.2.2. Submerged Metallic Pipelines | TS 5141 EN 12954 | ||
| TS EN 13636 | |||
| Inspection/Electrical/Cathodic Protection | 6.A.2.3. Ships | 6.A. Periodic Inspection | TS EN 13509 |
| TS EN 16222 | |||
| Inspection/Electrical/Cathodic Protection | 6.A.2.4. Port Facilities | 6.A. Periodic Inspection | TS EN 13509 |
| TS EN ISO 13174 | |||
| Inspection/Electrical/Cathodic Protection | 6.A.2.2.1. Buried Metallic Pipelines | 6.B. Design Conformity Check | Natural Gas Market Law No. 4646, |
| (Natural Gas Distribution Sector) | Regulations, Communiqués and Board Decisions of the Republic of Türkiye Energy Market Regulatory Authority (EPDK), | ||
| EPDK Specification and Contract for the Licensed Area, | |||
| TS EN 12954 | |||
| TS EN 13509 | |||
| TS 8037 | |||
| Inspection/Gas-Burning Appliances | 19.A. Layout Conformity Inspection | Republic of Türkiye Energy Market Regulatory Authority (EPDK) Internal Installations Regulation | |
| Regulation on the Protection of Buildings from Fire | |||
| 19.1. Commercial Cooking Appliances | Communiqué on General Technical Specifications for Construction Works, Mechanical and Electrical Installations | ||
| 19.2. Specially Designed Appliances for Industrial Purposes | TS 7363 | ||
| 19.3. Boiler Rooms and Heating Centres | |||
| Inspection/Sterilisation Equipment | Steam Sterilisers (Autoclaves) | Initial Inspection | TS EN ISO 17665-1 |
| Temperature Distribution Test | Periodic Inspection | TS EN ISO 17665-2 | |
| Heat Penetration Test | TS EN 285 | ||
| Microbiological Assessment | TS EN 13060 | ||
| Leakage Measurement | |||
| Pressure Test | |||
| Hollow Load Test | |||
| Small Load Temperature Test | |||
| Full Load Temperature Test | |||
| Bowie & Dick Test | |||
| Air Detector Test, Small Load | |||
| Air Detector Test, Full Load | |||
| Air Detector Function Test | |||
| Load Dryness Test | |||
| Steam Quality Test | |||
| -Non-Condensable Gas Test | |||
| -Dryness Value Test | |||
| -Superheat Test | |||
| Inspection/Sterilisation Equipment | Dry Heat Sterilisers | Initial Inspection | TS EN ISO 20857 |
| Temperature Distribution Test | Periodic Inspection | PDA Technical Report No:3- Validation Of Dry Heat Processes Used for Sterilization and Depyrogenation | |
| Heat Penetration Test | |||
| Microbiological Assessment | |||
| Leakage Measurement | |||
| Pressure Test | |||
| Inspection/Sterilisation Equipment | EtO (Ethylene Oxide) Gas Sterilisers | Initial Inspection | TS EN ISO 11135 |
| Temperature Distribution Test | Periodic Inspection | ||
| Heat Penetration Test | |||
| Microbiological Assessment | |||
| Leakage Measurement | |||
| Pressure Test | |||
| ETO Residue Assessment | |||
| Inspection/Sterilisation Equipment | Sterilisation Tunnel | Initial Inspection | TS EN ISO 20857 |
| Temperature Distribution Test | Periodic Inspection | PDA Technical Report No:3- Validation Of Dry Heat Processes Used for Sterilization and Depyrogenation | |
| Heat Penetration Test | |||
| Microbiological Assessment | |||
| Leakage Measurement | |||
| Pressure Test | |||
| Inspection/Sterilisation Equipment | H2O2 (Hydrogen Peroxide) Gas Sterilisers | Initial Inspection | TS EN ISO 14937 |
| Temperature Distribution Test | Periodic Inspection | ||
| Pressure Test | |||
| Microbiological Assessment | |||
| Inspection/Sterilisation Equipment | Washer-Disinfectors (Surgical Instruments) | Initial Inspection | TS EN ISO 15883-1 |
| Periodic Inspection | TS EN ISO 15883-2 | ||
| TS EN ISO 15883-5 | |||
| Inspection/Cleanrooms, Associated Controlled Environments and Ventilation Systems/Operating Theatres, Intensive Care Units and Other Hospital Hygienic Areas | HVAC Systems of Operating Theatres, Intensive Care Units and Other Hospital Hygienic Areas | Initial Inspection | ISO 14644-1 |
| Measurement of Airflow Rate, Air Velocity and Uniformity | Periodic Inspection | ISO 14644-2 | |
| Differential Pressure Measurement | ISO 14644-3 | ||
| HEPA and ULPA Filter Installation Leak Test | IEST-RP-CC006 | ||
| Particle Counting and Cleanroom Classification | IEST-RP-CC034 | ||
| Temperature and Humidity Measurement | DIN 1946-4 | ||
| Visualisation of Airflow Direction and Airflow Characteristics | ASHRAE 170 | ||
| Determination of Recovery Time | |||
| Measurement of Protection Level or Turbulence Intensity | |||
| Inspection/Cleanrooms, Associated Controlled Environments and Ventilation Systems/Production Areas, Laboratories and Laminar Airflow Areas | HVAC Systems of Production Areas, Laboratories and Laminar Airflow Areas | Initial Inspection | EudraLex Volume 4 Annex 1 GMP Medicinal Products for Human and Veterinary Use |
| Measurement of Airflow Rate, Air Velocity and Uniformity | Periodic Inspection | FDA cGMP – Sterile Drug Products Produced by Aseptic Processing | |
| Differential Pressure Measurement | ISO 14644-1 | ||
| HEPA and ULPA Filter Installation Leak Test | ISO 14644-2 | ||
| Particle Counting and Cleanroom Classification | ISO 14644-3 | ||
| Temperature and Humidity Measurement | IEST-RP-CC006 | ||
| Visualisation of Airflow Direction and Airflow Characteristics | IEST-RP-CC034 | ||
| Determination of Recovery Time | |||
| Inspection/Cleanrooms, Associated Controlled Environments and Ventilation Systems/Biological Safety Cabinets | Biological Safety Cabinets | Initial Inspection | TS EN 12469 |
| Downflow Air Velocity Measurement | Periodic Inspection | ANSI/NSF-49 | |
| Inflow Air Velocity Measurement | IEST-RP-CC034 | ||
| HEPA and ULPA Filter Installation Leak Test | |||
| Airflow Direction and Visualisation | |||
| Check of Alarms and Other Functions | |||
| Inspection/Cleanrooms, Associated Controlled Environments and Ventilation Systems/Laminar Airflow Cabinets | Laminar Airflow Cabinets | Initial Inspection | TS EN ISO 14644-1 |
| Air Velocity Measurement | Periodic Inspection | TS EN ISO 14644-2 | |
| HEPA and ULPA Filter Installation Leak Test | TS EN ISO 14644-3 | ||
| Airflow Direction and Visualisation | IEST-RP-CC006 | ||
| Particle Counting | IEST-RP-CC034 | ||
| IEST-RP-CC002 | |||
| Inspection/Cleanrooms, Associated Controlled Environments and Ventilation Systems/Isolators | Isolators | Initial Inspection | ISO 14644-7 |
| Periodic Inspection | |||
| Inspection/Cleanrooms, Associated Controlled Environments and Ventilation Systems/Fume Cupboards | Fume Cupboards | Initial Inspection (without Type Test Certificate) | TS EN 14175-1 |
| Check of Alarms and Other Functions | Initial Inspection (with Type Test Certificate) | TS EN 14175-2 | |
| Airflow Direction and Visualisation | Periodic Inspection | TS EN 14175-3 | |
| Inflow Air Velocity Measurement | TS EN 14175-4 | ||
| Volumetric Extract Flow Rate Measurement | TS EN 14175-6 | ||
| Room Air Velocity Measurement — Containment Measurement | |||
| Robustness of Containment | |||
| Air Exchange Efficiency — Pressure Drop Measurement | |||
| Inspection/Cleanrooms, Associated Controlled Environments and Ventilation Systems/Ventilation and Air-Conditioning Systems | Ventilation and Air-Conditioning Systems | Initial Inspection | TS EN 1507 |
| Rectangular Metal Ventilation Ducts | Periodic Inspection | TS EN 12237 | |
| Circular Metal Ventilation Ducts | ANSI/SMACNA-016 | ||
| BESA/DW 143 | |||
| Inspection/Cleanrooms, Associated Controlled Environments and Ventilation Systems/Temperature and Humidity Mapping | Warehouses, Cold Rooms | Initial Inspection | EU Guideline on Good Distribution Practice of Medicinal Products For Human Use |
| – Temperature and Humidity Performance Verification | Periodic Inspection | ||
| WHO Technical Report Series No.961, Annex 9 Supplement 7,8 FDA 21 CFR Part 11 | |||
| Inspection/Cleanrooms, Associated Controlled Environments and Ventilation Systems/Temperature and Humidity Mapping | Stability Rooms and Climatic Chambers | Initial Inspection | EudraLex Volume 4 Annex 15 Good Manufacturing Practice(GMP) for Human and Veterinary Use |
| – Temperature and Humidity Performance Verification | Periodic Inspection | EU Guidelines on Good Distribution Practice (GDP) of Medicinal Products for Human Use | |
| WHO Technical Report Series No.961, Annex 9 Supplement 7,8 FDA 21 CFR Part 1 | |||
| Inspection/Cleanrooms, Associated Controlled Environments and Ventilation Systems/Biocontamination Measurements | Biocontamination Measurements | Initial Inspection | TS EN 17141 |
| Periodic Inspection | |||
| Sampling | |||
| Volumetric (Active) Air Biocontamination Monitoring | |||
| Passive Air Biocontamination Monitoring | |||
| Surface Biocontamination Monitoring | |||
| Personnel Biocontamination Monitoring | |||
| a- Clothing Biocontamination Measurements | |||
| b- Hand (Gloved) Biocontamination Measurements | |||
| c- Forehead Biocontamination Monitoring | |||
| Evaluation and Interpretation of Biocontamination Data | |||
| Inspection/Cleanrooms, Associated Controlled Environments and Ventilation Systems/Production Areas, Laboratories and Laminar Airflow Areas | HVAC Systems of Production Areas, Laboratories and Laminar Airflow Areas | Initial Inspection | EudraLex – Volume 4 – Annex 1 Good Manufacturing Practice (GMP) for Human and Veterinary Use |
| Measurement of Airflow Rate, Air Velocity and Uniformity | Periodic Inspection | FDA cGMP – Sterile Drug Products Produced by Aseptic Processing | |
| Differential Pressure Measurement | ISO 14644-1 | ||
| HEPA and ULPA Filter Installation Leak Test | ISO 14644-2 | ||
| Particle Counting and Cleanroom Classification | ISO 14644-3 | ||
| Temperature and Humidity Measurement — Visualisation of Airflow Direction and Airflow Characteristics | IEST-RP-CC006 | ||
| Determination of Recovery Time | IEST-RP-CC034 | ||
| Inspection/Cleanrooms, Associated Controlled Environments and Ventilation Systems/Operating Theatres, Intensive Care Units and Other Hospital Hygienic Areas | HVAC Systems of Operating Theatres, Intensive Care Units and Other Hospital Hygienic Areas | Initial Inspection | DIN 1946-4 |
| Measurement of Airflow Rate, Air Velocity and Uniformity | Periodic Inspection | ISO 14644-1 | |
| Differential Pressure Measurement | ISO 14644-2 | ||
| HEPA and ULPA Filter Installation Leak Test | ISO 14644-3 | ||
| Particle Counting and Cleanroom Classification | IEST-RP-CC006 | ||
| Temperature and Humidity Measurement | IEST-RP-CC034 | ||
| Visualisation of Airflow Direction and Airflow Characteristics | ASHRAE 170 | ||
| Determination of Recovery Time | |||
| Measurement of Protection Level or Turbulence Intensity | |||
| Inspection/Cleanrooms, Associated Controlled Environments and Ventilation Systems/Temperature and Humidity Mapping | Temperature and Humidity Mapping | Initial Inspection | TS EN IEC 60068-3-5 |
| Transport Vehicles, Active/Passive Transport Containers | Periodic Inspection | TS EN IEC 60068-3-6 | |
| – Temperature and Humidity Performance Verification | TS EN 60068-3-7 | ||
| EU Guideline on Good Distribution Practice of Medicinal Products For Human Use | |||
| WHO Technical Report Series No.961, Annex 9 Supplement 7, 8, 11, 13, 14 | |||
| FDA 21 CFR Part 11 | |||
| Inspection/Surveying/Weight and Quantity Checks | Cargo Transport and Storage Units | Weight and Quantity Checks on Cargo/Stored Products | Republic of Türkiye MINISTRY OF TRADE Inward Processing Regime Decision No. 2005/8391 (DİR) |
| Sea Transport Vessels | Weighbridge Supervision | Republic of Türkiye MINISTRY OF TRADE Outward Processing Regime Decision No. 2007/11864 (HİR) | |
| Road Transport Vehicles | Ullage/Innage (Sounding) Survey | ||
| Rail Transport Vehicles | Stock Quantity Determination | ||
| Tanks and Containers | Weight Checks on Packaged Cargo | ||
| Transport Containers and Packages | Quantity Determination by Counting/Tallying | ||
| Pipelines | Gas Quantity Determination | ||
| Open and Covered Stockyards | Draft Survey | ||
| Bonded Warehouse | Bunker Survey (Ship Fuel Quantity Determination) | ||
| Land-Based Storage Tanks (Vertical, Horizontal and Spherical Tanks) | Preparation of a Volume Capacity Table | ||
| Inspection/Surveying/Weight and Quantity Checks | Agricultural Products | Weight and Quantity Checks | Gafta 123 Rules |
| Weighbridge Supervision | |||
| Draft Survey | |||
| Ullage/Innage (Sounding) Survey | |||
| Stock Quantity Determination | |||
| Weight Checks on Packaged Cargo | |||
| Quantity Determination by Counting/Tallying | |||
| Inspection/Surveying/Solid Products (Bulk / Packaged) | Oils and Fats | Weight and Quantity Checks | FOSFA International Code of Practice for Member Superintendents |
| Oilseeds | Weighbridge Supervision | ||
| Draft Survey | |||
| Ullage/Innage (Sounding) Survey | |||
| Stock Quantity Determination | |||
| Weight Checks on Packaged Cargo | |||
| Quantity Determination by Counting/Tallying | |||
| Inspection/Surveying/Conformity Checks on Cargo Transport and Storage Units | Cargo Transport and Storage Units | Damage Check | Republic of Türkiye MINISTRY OF TRADE Inward Processing Regime Decision No. 2005/8391 (DİR) |
| Sea Transport Vessels | Condition Check | Republic of Türkiye MINISTRY OF TRADE Outward Processing Regime Decision No. 2007/11864 (HİR) | |
| Road Transport Vehicles | Ship On-Hire/Off-Hire Condition Survey | IMO/ILO/UNECE CODE OF PRACTICE FOR PACKING OF CARGO TRANSPORT UNITS (CTU CODE) | |
| Rail Transport Vehicles | Cleanliness Check | ||
| Tanks and Containers | Stowage and Lashing Check | ||
| Transport Containers and Packages | Supervision of Sealing and Unsealing | ||
| Pipelines | Supervision of Fumigation | ||
| Open and Covered Stockyards, Bonded Warehouses | Supervision of Ship-to-Ship Bunkering | ||
| Hatch Cover Weathertightness Check | |||
| Cargo Hold and Stowage Space Capacity Check | |||
| Inspection of the Store to Be Loaded or Unloaded | |||
| Inspection/Surveying/Physical Inspection | Cargo or Stored Product | Sampling | Gafta 124 Rules |
| Crude Oil and Petroleum Products | Supervision of Sampling | FOSFA International Code of Practice for Member Superintendents | |
| Natural Gas | Republic of Türkiye MINISTRY OF TRADE Inward Processing Regime Decision No. 2005/8391 (DİR) | ||
| Chemical Products | Republic of Türkiye MINISTRY OF TRADE Outward Processing Regime Decision No. 2007/11864 (HİR) | ||
| Agricultural Products | |||
| Seeds, Animal Feed, Pulses, Cereals and Cereal Products | |||
| Oils and Fats | |||
| Oilseeds | |||
| Food Products | |||
| Metallurgical Products | |||
| Scrap | |||
| Industrial Products and General Consumer Goods | |||
| Textile and Leather Products | |||
| Wood and Forestry Products | |||
| Electrical/Electronic Products | |||
| Ores and Minerals | |||
| Construction Materials | |||
| Rubber and Plastic Products | |||
| Mechanical Systems and Components | |||
| Inspection/Surveying/Supervision | Cargo or Stored Product | Supervision | Gafta Approved Superintendent Code of Practice |
| Crude Oil and Petroleum Products | Supervision Before, During and After Loading, Unloading or Transfer | FOSFA International Code of Practice for Member Superintendents | |
| Natural Gas | Supervision of Analysis and Laboratory Services | ||
| Chemical Products | Production Supervision | ||
| Agricultural Products | |||
| Seeds, Animal Feed, Pulses, Cereals and Cereal Products | |||
| Oils and Fats | |||
| Oilseeds | |||
| Food Products | |||
| Metallurgical Products | |||
| Scrap | |||
| Industrial Products and General Consumer Goods | |||
| Textile and Leather Products | |||
| Wood and Forestry Products | |||
| Electrical/Electronic Products | |||
| Motor Vehicles | |||
| Ores and Minerals | |||
| Construction materials | |||
| Rubber and Plastic Products | |||
| Mechanical Systems and Components | |||
| Inspection/Surveying/Physical Inspection | Cargo or Stored Product | Physical Inspection | Gafta 124 Rules |
| Crude Oil and Petroleum Products | Damage Assessment | Gafta Approved Superintendent Code of Practice | |
| Natural Gas | Visual Quality Inspection | FOSFA International Code of Practice for Member Superintendents | |
| Chemical Products | Quality Control | Republic of Türkiye MINISTRY OF TRADE Inward Processing Regime Decision No. 2005/8391 (DİR) | |
| Agricultural Products | Storage Check | Republic of Türkiye MINISTRY OF TRADE Outward Processing Regime Decision No. 2007/11864 (HİR) | |
| Seeds, Animal Feed, Pulses, Cereals and Cereal Products | Stowage and Lashing Check | ||
| Oils and Fats | Label Check | ||
| Oilseeds | Document Control | ||
| Food Products | Functional Check | ||
| Metallurgical Products | Verification of Conformity (VoC) | ||
| Scrap | |||
| Industrial Products and General Consumer Goods | |||
| Textile and Leather Products | |||
| Wood and Forestry Products | |||
| Electrical/Electronic Products | |||
| Motor Vehicles | |||
| Ores and Minerals | |||
| Construction Materials | |||
| Rubber and Plastic Products | |||
| Mechanical Systems and Components | |||
| Inspection/Surveying/Physical Inspection | Crude Oil and Petroleum Products | National Marker Check | |
| Supervision of Quantity Weighing, Receipt and Addition to the Product | |||
| Supervision of Concentration Measurements | |||
| Stock Determination | |||
| Inspection/Surveying/Radiation Checks | Metallurgical Products | Radiation Checks | |
| Scrap | |||
| Ores and Minerals | |||
| Environment | |||
| Inspection/Surveying/Solid Products (Bulk / Packaged)/Textiles and Textile Products (Fabric, Apparel, Home Textiles, etc.) | Textile and Leather Products | Supervision Before, During and After Loading, Unloading or Transfer | |
| Supervision of Analysis and Laboratory Services | |||
| Visual Quality Inspection | |||
| Quality Control | |||
| Inspection/Ships/New Ship Construction and Conversion | Newbuild Ships | Initial Inspection | |
| New Ship Construction and Conversion | |||
| (Calculation/Plan Review and Approval, Newbuild and Statutory Certificate Surveys, and Company Audits) | |||
| Inspection/Ships/Ships in Service | Ships in Service | Periodic Inspection | |
| Inspection/Non-Destructive Testing | 13. Non-Destructive Testing | 13.A. Acoustic Emission Testing | |
| Inspection/Non-Destructive Testing | 13. Non-Destructive Testing | 13.B. Acoustic Leak Testing (under vacuum) | |
| Inspection/Non-Destructive Testing | 13. Non-Destructive Testing | 13.C. Radiographic Testing | |
| 13.C.I. Radiographic Film Exposure and Interpretation RT-F | |||
| 13.C.II. Digital Radiographic Exposure and Interpretation RT-D | |||
| 13.C.III. Computed Radiographic Exposure and Interpretation RT-CT | |||
| 13.C.IV. Radioscopic Imaging and Interpretation RT-S | |||
| 13.C.V. Radiographic Film Interpretation RT-FI | |||
| 13.C.VI. Digital Radiographic Image Interpretation RT-DI | |||
| 13.C.VII. Radiographic Film and Digital Image Interpretation RT-FDI | |||
| Inspection/Non-Destructive Testing | 13. Non-Destructive Testing | 13.D. Visual Testing | |
| Inspection/Non-Destructive Testing | 13. Non-Destructive Testing | 13.E. Magnetic Particle Testing (MT) | |
| 13.E.I. Flux Leakage Testing (MT-FL) | |||
| Inspection/Non-Destructive Testing | 13. Non-Destructive Testing | 13.F. Liquid Penetrant Testing | |
| Inspection/Non-Destructive Testing | 13. Non-Destructive Testing | 13.H. Ultrasonic Testing | |
| 13.H.I. TOFD (UT-TOFD) | |||
| 13.H.II. Phased Array (UT-PA) | |||
| 13.H.III. Ultrasonic Testing (UT) | |||
| Inspection/Non-Destructive Testing | 13. Non-Destructive Testing | 13.G. Magnetic Rope Testing | |
| Inspection/Non-Destructive Testing | 13. Non-Destructive Testing | 13.I. Performing, Evaluating and Approving Vacuum Tests | |
| Inspection/Process Systems/Welded Fabrication | Pipelines | Design Inspection | |
| Inspection/Process Systems/Welded Fabrication | Piping | Design Inspection | |
| Inspection/Process Systems/Welded Fabrication | Metal Structures | Design Inspection | |
| Inspection/Process Systems/Welded Fabrication | Piping | Manufacturing and Assembly Process Inspection | |
| Inspection/Process Systems/Welded Fabrication | Pipelines | Manufacturing and Assembly Process Inspection | |
| Inspection/Process Systems/Welded Fabrication | Metal Structures | Manufacturing and Assembly Process Inspection | |
| Inspection/Process Systems/Welded Fabrication | Metallic Materials | Manufacturing and Assembly Process Inspection | |
| Plates | |||
| Sections | |||
| Pipes | |||
| Castings | |||
| Forgings | |||
| Fasteners | |||
| Inspection/Process Systems/Polymer and Composite Materials | Plastic Pipes and Fittings | Manufacturing and Assembly Process Inspection | |
| PE Pipes | |||
| HDPE Pipes | |||
| PVC-U Pipes | |||
| PP Pipes | |||
| PEX Pipes | |||
| Spiral Pipes | |||
| Corrugated Pipes | |||
| GRP Pipes | |||
| Inspection/Process Systems/Welded Fabrication | Permanent Joints | Procedure Evaluation | |
| Welding | |||
| Soldering/Brazing | |||
| Inspection/Process Systems/Welded Fabrication | Metallic Materials | Material Assessment and Certification | EN 10204 |
| Plates | |||
| Sections | |||
| Pipes | |||
| Castings | |||
| Forgings | |||
| Fasteners | |||
| Aluminium Sections | |||
| Inspection/Process Systems/Polymer and Composite Materials | Plastic Pipes and Fittings | Material Assessment and Certification | |
| PE Pipes | |||
| HDPE Pipes | |||
| PVC-U Pipes | |||
| PP Pipes | |||
| PEX Pipes | |||
| Spiral Pipes | |||
| Corrugated Pipes | |||
| GRP Pipes | |||
| Inspection/Process Systems/Polymer and Composite Materials | Polymer and Composite Products | Production Process and Product Inspection | |
| Inspection/Process Systems/Coating Inspection | Paint and Coating Inspection | Product Inspection | |
| Application Inspection | |||
| Periodic Inspection | |||
| Inspection/Process Systems/Welded Fabrication | Piping | Periodic Inspection | |
| Inspection/Process Systems/Welded Fabrication | Pipelines | Periodic Inspection | |
| Inspection/Process Systems/Welded Fabrication | Drill String Components | Manufacturing and Assembly Process Inspection | |
| Drilling Equipment | Periodic Inspection | ||
| Inspection/Process Systems/Welded Fabrication | Containers | Manufacturing Process Checks and Granting of CSC Approval | European Agreement concerning the International Carriage of Dangerous Goods by Road, ADR Chapter 6.11 |
| Bulk Containers | Periodic Inspections | EN 10855-1 | |
| Design Inspection | |||
| Inspection/Process Systems/Welded Fabrication | Welding Filler Metals | Inspection and Certification | |
| Inspection/Process Systems/Welded Fabrication | Hydrocarbon, petrochemical, gas and chemical industrial facilities | Risk-Based Inspection (RBI) | API 580 |
| Pressure vessels | API RP 581 | ||
| Pipes | API RP 579 | ||
| Tanks | API RP 571 | ||
| Pressure relief equipment | |||
| Heat exchanger tube bundles | |||
| Inspection/Process Systems/Welded Fabrication | Valves | Design Inspection | |
| Inspection/Process Systems/Welded Fabrication | Underground/Aboveground Tanks Storing Flammable or Non-Flammable Liquids and Liquid Petroleum Products, and Connected Pipelines | Gas Freeing | |
| Inspection/Process Systems/Welded Fabrication | Underground/Aboveground Tanks Storing Flammable or Non-Flammable Liquids and Liquid Petroleum Products, and Connected Pipelines | Interstitial Leak Detection Systems | |
| Inspection/Process Systems/Welded Fabrication | Other Than Natural Gas | Design Review and Approval | |
| Internal Installation Applications in Industrial and Commercial Facilities | Manufacturing and Installation Process Check | ||
| Material Inspection and Verification | |||
| Inspection/Process Systems/Welded Fabrication | Flexible Hoses and Pipes | Periodic Inspections | ISGOTT |
| TS EN ISO 1402, TS EN ISO 4671, TS EN ISO 7233, TS EN ISO 7326, TS EN ISO 8033, TS EN ISO 10619-2, | |||
| ISO 1817, ISO 13628-10 | |||
| ASTM F2805-16 | |||
| BS 4089 | |||
| API SPEC 17K | |||
| EN 1762 | |||
| Inspection/Vehicle Inspection | Motorised and non-motorised road vehicles subject to registration and technical inspection. | Vehicle Inspection | Regulation on the Establishment and Operation of Vehicle Inspection Stations and Vehicle Inspection. |
| The “Defects Table” within national rules published by the Republic of Türkiye Ministry of Transport and Infrastructure. | |||
| Inspection/Vehicle Inspection | Motor vehicles used for passenger transport with more than nine seats including the driver’s seat, and non-motorised vehicles used to carry goods, | Roadworthiness Inspection | Regulation on the Establishment and Operation of Vehicle Inspection Stations and Vehicle Inspection. |
| Motor vehicles with a maximum laden weight exceeding 3500kg, or motor vehicles with a permitted maximum combination weight exceeding 3500 kg when towing a trailer. | The “Defect Groups Directive” on Roadworthiness Inspection and Deficiencies Identified by Inspection. | ||
| Inspection/Vehicle Inspection | -Four-wheeled motor vehicles used to carry passengers with more than eight seats excluding the driver’s seat | Exhaust Gas Emission Measurement and Control | Regulation on Exhaust Gas Emission Control and Petrol and Diesel Quality |
| -Motor vehicles used to carry goods with a permissible maximum weight exceeding 3500 kg | |||
| -Taxis and ambulances | |||
| -Motor vehicles with at least four wheels normally used to carry goods by road and a maximum permissible weight below 3500 kg, excluding agricultural and forestry tractors | |||
| -Motor vehicles with at least four wheels used to carry passengers with no more than eight seats excluding the driver’s seat | |||
| Inspection/Vehicle Inspection | Vehicle Fuel Systems (LPG/CNG/LNG) | Installation and Gas Tightness Conformity Checks | UN/ECE R-67 |
| UN/ECE R-110 | |||
| UN/ECE R-115 | |||
| TS ISO 3691 | |||
| TS 13317 | |||
| TS 12305 EN 12979 | |||
| Inspection/Technical Service for Motor Vehicles and Their Trailers | School Vehicles (excluding those over 10 years old) | Conformity Checks against the AİTM Regulation | Regulation on the Manufacture, Modification and Assembly of Vehicles (A.İ.T.M) |
| Inspection/Lifts/7.A. Periodic Inspection/7.A.1. Electrically Driven Lifts | 7.A.1. Electrically Driven Lifts | 7.A. Periodic Inspection | Lift Periodic Inspection Regulation |
| Inspection/Lifts/7.A. Periodic Inspection/7.A.2. Hydraulically Driven Lifts | 7.A.2. Hydraulically Driven Lifts | 7.A. Periodic Inspection | Lift Periodic Inspection Regulation |
| Inspection/Electrical/Electrical Installations | 6.A.1.1. Earthing Installation | 6.A. Periodic Inspection | Regulation on Health and Safety Requirements for the Use of Work Equipment |
| Regulation on Earthing in Electrical Installations | |||
| Inspection/Electrical/Electrical Installations | 6.A.1.3. Lightning Protection Systems | 6.A. Periodic Inspection | Regulation on Health and Safety Requirements for the Use of Work Equipment |
| Active Lightning Rod/Air-Termination Rod Installation | Regulation on Earthing in Electrical Installations | ||
| Faraday Cage Installation | TS EN 62305-1 | ||
| TS EN 62305-3 | |||
| Inspection/Electrical/Electrical Installations | 6.A.1.4. Residual/Leakage Current Measurement | 6.A. Periodic Inspection | Regulation on Health and Safety Requirements for the Use of Work Equipment |
| Regulation on Earthing in Electrical Installations | |||
| Regulation on Internal Electrical Installations | |||
| Inspection/Electrical/Electrical Installations | 6.A.1.5. Visual Inspection of Electrical Panels | 6.A. Periodic Inspection | Regulation on Health and Safety Requirements for the Use of Work Equipment |
| Regulation on Earthing in Electrical Installations | |||
| Regulation on Internal Electrical Installations | |||
| Inspection/Electrical/Electrical Installations | 6.A.1.6. Functional Inspection of Electrical Panels | 6.A. Periodic Inspection | Regulation on Health and Safety Requirements for the Use of Work Equipment |
| Regulation on Earthing in Electrical Installations | |||
| Regulation on Internal Electrical Installations | |||
| Inspection/Electrical/Electrical Installations | 6.A.1.7. Thermographic Inspection | 6.A. Periodic Inspection | Regulation on Health and Safety Requirements for the Use of Work Equipment |
| Inspection/Electrical/Electrical Installations | 6.A.1.8. Power Factor Correction Systems | 6.A. Periodic Inspection | Regulation on Health and Safety Requirements for the Use of Work Equipment |
| Regulation on Internal Electrical Installations | |||
| Inspection/Electrical/Electrical Installations | 6.A. Periodic Inspection | Regulation on Health and Safety Requirements for the Use of Work Equipment | |
| 6.A.1.9. Insulation Measurements | Regulation on Earthing in Electrical Installations | ||
| 6.1.9.1. Insulation Resistance Measurement | Regulation on Internal Electrical Installations | ||
| 6.1.9.2. Floor Insulation Resistance Measurement | TS EN 61057 | ||
| 6.1.9.3. Basket Insulation on Aerial Platform Vehicles Used for High-Voltage Work | |||
| Inspection/Electrical/Electrical Installations | 6.A.1.10. Energy Analysis and Harmonic Measurement | 6.A. Periodic Inspection | TS EN 50160 |
| Inspection/Electrical/Electrical Installations/High-Voltage Systems | 6.1.11. High-Voltage Systems | 6.A. Periodic Inspection | Regulation on Electrical Power Installations |
| Inspection/Electrical/Electrical Installations/Generators | 6.1.12. Generators | 6.A. Periodic Inspection | TS ISO 8528-1 |
| Inspection/Electrical/Electrical Installations/High-/Low-Voltage Materials and Equipment | 6.B. Manufacturing Process Check | IEC 60502 | |
| 6.1.13. High-/Low-Voltage Materials and Equipment | IEC 60840 | ||
| 6.1.13.1. Cables | IEC 60947 | ||
| 6.1.13.2. Low-voltage switchgear and controlgear | IEC 60076 | ||
| 6.1.13.3. Power transformers | TS EN 61439-1 | ||
| 6.1.13.4. Electrical Panel | |||
| Inspection/Electrical/Electrical Installations/Soil Resistivity Measurement | 6.1.2. Soil Resistivity Measurement | 6.C. Initial Inspection | TS 4363 |
| Inspection/Electrical | Special Electrical Installations — Low-Voltage Electrical Installations | 6.A. Periodic Inspection | IEC 60364-7-702 Swimming Pools and Other Basins |
| Inspection/Electrical/Electrical Installations | IEC 60364-7-704 Construction Site Installations | ||
| IEC 60364-7-708 Electrical Installations in Caravan Parks, Camping Parks and Similar Locations | |||
| IEC 60364-7-710 Medical Locations | |||
| IEC 60364-7-714 External Lighting Installations | |||
| IEC 60364-7-722 Supplies for Electric Vehicles | |||
| Inspection/Electrical/Electrical Installations | Portable Electrical Appliances (PAT Testing) | 6.A Periodic Inspection | Regulation on Health and Safety Requirements for the Use of Work Equipment |
| Inspection/Electrical | DIN VDE 0701-0702 | ||
| Inspection/Electrical/Electrical Installations | Electric Vehicle Charging Units and Stations | Installation and Safety Requirements | TS 13912 |
| Inspection/Fire Protection Systems/5.A. Periodic Inspection | 5.A.1. Sprinkler Systems | 5.A. Periodic Inspection | Regulation on Health and Safety Requirements for the Use of Work Equipment |
| Regulation on the Protection of Buildings from Fire | |||
| Inspection/Fire Protection Systems/5.A. Periodic Inspection | 5.A.2. Fire Water Tank | 5.A. Periodic Inspection | Regulation on Health and Safety Requirements for the Use of Work Equipment |
| Regulation on the Protection of Buildings from Fire | |||
| Inspection/Fire Protection Systems/5.A. Periodic Inspection | 5.A.3. Fire Pump Station | 5.A. Periodic Inspection | Regulation on Health and Safety Requirements for the Use of Work Equipment |
| Regulation on the Protection of Buildings from Fire | |||
| Inspection/Fire Protection Systems/5.A. Periodic Inspection | 5.A.4. Fire Hydrant System | 5.A. Periodic Inspection | Regulation on Health and Safety Requirements for the Use of Work Equipment |
| Regulation on the Protection of Buildings from Fire | |||
| Inspection/Fire Protection Systems/5.A. Periodic Inspection | 5.A.5. Fire Hose Reel System | 5.A. Periodic Inspection | Regulation on Health and Safety Requirements for the Use of Work Equipment |
| Regulation on the Protection of Buildings from Fire | |||
| Inspection/Fire Protection Systems/5.A. Periodic Inspection | 5.A.6. Water Spray Systems | 5.A. Periodic Inspection | Regulation on Health and Safety Requirements for the Use of Work Equipment |
| Regulation on the Protection of Buildings from Fire | |||
| Inspection/Fire Protection Systems/5.A. Periodic Inspection | 5.A.7. Water Mist Systems | 5.A. Periodic Inspection | Regulation on Health and Safety Requirements for the Use of Work Equipment |
| Regulation on the Protection of Buildings from Fire | |||
| Inspection/Fire Protection Systems/5.A. Periodic Inspection | 5.A.8. Foam Fire-Extinguishing Systems | 5.A. Periodic Inspection | Regulation on Health and Safety Requirements for the Use of Work Equipment |
| Regulation on the Protection of Buildings from Fire | |||
| Inspection/Fire Protection Systems/5.A. Periodic Inspection | 5.A.9. Portable Fire Extinguisher Placement | 5.A. Periodic Inspection | Regulation on Health and Safety Requirements for the Use of Work Equipment |
| Regulation on the Protection of Buildings from Fire | |||
| Inspection/Fire Protection Systems/5.A. Periodic Inspection | 5.A.10. Detection and Alarm Systems | 5.A. Periodic Inspection | Regulation on Health and Safety Requirements for the Use of Work Equipment |
| Regulation on the Protection of Buildings from Fire | |||
| Inspection/Fire Protection Systems/5.A. Periodic Inspection | 5.A.11. Clean Agent Automatic Fire-Extinguishing Systems | 5.A. Periodic Inspection | Regulation on Health and Safety Requirements for the Use of Work Equipment |
| Regulation on the Protection of Buildings from Fire | |||
| Inspection/Fire Protection Systems/5.A. Periodic Inspection | 5.A.12. CO2 Automatic Fire-Extinguishing Systems | 5.A. Periodic Inspection | Regulation on Health and Safety Requirements for the Use of Work Equipment |
| Regulation on the Protection of Buildings from Fire | |||
| Inspection/Fire Protection Systems/5.A. Periodic Inspection | 5.A.13. Dry / Wet Chemical Automatic Fire-Extinguishing Systems | 5.A. Periodic Inspection | Regulation on Health and Safety Requirements for the Use of Work Equipment |
| Regulation on the Protection of Buildings from Fire | |||
| Inspection/Fire Protection Systems/5.A. Periodic Inspection | 5.A.14. Emergency Lighting and Escape Signage Systems | 5.A. Periodic Inspection | Regulation on Health and Safety Requirements for the Use of Work Equipment |
| Regulation on the Protection of Buildings from Fire | |||
| Inspection/Fire Protection Systems/5.A. Periodic Inspection | 5.A.15. Smoke Extraction Systems | 5.A. Periodic Inspection | Regulation on Health and Safety Requirements for the Use of Work Equipment |
| Regulation on the Protection of Buildings from Fire | |||
| Inspection/Fire Protection Systems/5.A. Periodic Inspection | 5.A.16. Escape Route Pressurisation Systems | 5.A. Periodic Inspection | Regulation on Health and Safety Requirements for the Use of Work Equipment |
| Regulation on the Protection of Buildings from Fire | |||
| Inspection/Fire Protection Systems/5.B. Design Inspection | 5.B.1. Sprinkler Systems | 5.B. Design Inspection | |
| Inspection/Fire Protection Systems/5.B. Design Inspection | 5.B.2. Fire Water Tank | 5.B. Design Inspection | |
| Inspection/Fire Protection Systems/5.B. Design Inspection | 5.B.3. Fire Pump Station | 5.B. Design Inspection | |
| Inspection/Fire Protection Systems/5.B. Design Inspection | 5.B.4. Fire Hydrant System | 5.B. Design Inspection | |
| Inspection/Fire Protection Systems/5.B. Design Inspection | 5.B.5. Fire Hose Reel System | 5.B. Design Inspection | |
| Inspection/Fire Protection Systems/5.B. Design Inspection | 5.B.6. Water Spray Systems | 5.B. Design Inspection | |
| Inspection/Fire Protection Systems/5.B. Design Inspection | 5.B.7. Water Mist Systems | 5.B. Design Inspection | |
| Inspection/Fire Protection Systems/5.B. Design Inspection | 5.B.8. Foam Fire-Extinguishing Systems | 5.B. Design Inspection | |
| Inspection/Fire Protection Systems/5.B. Design Inspection | 5.B.9. Portable Fire Extinguisher Placement | 5.B. Design Inspection | |
| Inspection/Fire Protection Systems/5.B. Design Inspection | 5.B.10. Detection and Alarm Systems | 5.B. Design Inspection | |
| Inspection/Fire Protection Systems/5.B. Design Inspection | 5.B.11. Clean Agent Automatic Fire-Extinguishing Systems | 5.B. Design Inspection | |
| Inspection/Fire Protection Systems/5.B. Design Inspection | 5.B.12. CO2 Automatic Fire-Extinguishing Systems. | 5.B. Design Inspection | |
| Inspection/Fire Protection Systems/5.B. Design Inspection | 5.B.13. Dry / Wet Chemical Automatic Fire-Extinguishing Systems | 5.B. Design Inspection | |
| Inspection/Fire Protection Systems/5.B. Design Inspection | 5.B.14. Emergency Lighting and Escape Signage Systems | 5.B. Design Inspection | |
| Inspection/Fire Protection Systems/5.B. Design Inspection | 5.B.15. Smoke Extraction Systems | 5.B. Design Inspection | |
| Inspection/Fire Protection Systems/5.B. Design Inspection | 5.B.16. Escape Route Pressurisation Systems | 5.B. Design Inspection | |
| Inspection/Fire Protection Systems/5.C. Initial Inspection | 5.C.1. Sprinkler Systems | 5.C. Initial Inspection | |
| Inspection/Fire Protection Systems/5.C. Initial Inspection | 5.C.2. Fire Water Tank | 5.C. Initial Inspection | |
| Inspection/Fire Protection Systems/5.C. Initial Inspection | 5.C.3. Fire Pump Station | 5.C. Initial Inspection | |
| Inspection/Fire Protection Systems/5.C. Initial Inspection | 5.C.4. Fire Hydrant System | 5.C. Initial Inspection | |
| Inspection/Fire Protection Systems/5.C. Initial Inspection | 5.C.5. Fire Hose Reel System | 5.C. Initial Inspection | |
| Inspection/Fire Protection Systems/5.C. Initial Inspection | 5.C.6. Water Spray Systems | 5.C. Initial Inspection | |
| Inspection/Fire Protection Systems/5.C. Initial Inspection | 5.C.7. Water Mist Systems | 5.C. Initial Inspection | |
| Inspection/Fire Protection Systems/5.C. Initial Inspection | 5.C.8. Foam Fire-Extinguishing Systems | 5.C. Initial Inspection | |
| Inspection/Fire Protection Systems/5.C. Initial Inspection | 5.C.9. Portable Fire Extinguisher Placement | 5.C. Initial Inspection | |
| Inspection/Fire Protection Systems/5.C. Initial Inspection | 5.C.10. Detection and Alarm Systems | 5.C. Initial Inspection | |
| Inspection/Fire Protection Systems/5.C. Initial Inspection | 5.C.11. Clean Agent Automatic Fire-Extinguishing Systems | 5.C. Initial Inspection | |
| Inspection/Fire Protection Systems/5.C. Initial Inspection | 5.C.12. CO2 Automatic Fire-Extinguishing Systems. | 5.C. Initial Inspection | |
| Inspection/Fire Protection Systems/5.C. Initial Inspection | 5.C.13. Dry / Wet Chemical Automatic Fire-Extinguishing Systems | 5.C. Initial Inspection | |
| Inspection/Fire Protection Systems/5.C. Initial Inspection | 5.C.14. Emergency Lighting and Escape Signage Systems | 5.C. Initial Inspection | |
| Inspection/Fire Protection Systems/5.C. Initial Inspection | 5.C.15. Smoke Extraction Systems | 5.C. Initial Inspection | |
| Inspection/Fire Protection Systems/5.C. Initial Inspection | 5.C.16. Escape Route Pressurisation Systems | 5.C. Initial Inspection | |
| Inspection/Atmospheric Storage Tanks/4.A. Periodic Inspection | 4.A.1. Atmospheric Storage Tanks | 4.A. Periodic Inspection | Regulation on Health and Safety Requirements for the Use of Work Equipment |
| 4.A.1.1. Atmospheric, dished horizontal or vertical cylindrical, prismatic, steel or thermoplastic, open or closed hazardous liquid storage tank | |||
| 4.A.1.2. Atmospheric, vertical, cylindrical, aboveground, welded steel hazardous liquid storage tanks with open or closed roofs | |||
| Inspection/Atmospheric Storage Tanks/4.B. Design Inspection | 4.B.1. Atmospheric Storage Tanks | 4.B. Design Inspection | |
| Inspection/Atmospheric Storage Tanks/4.C. Manufacturing and Assembly Process Inspection | 4.C.1. Atmospheric Storage Tanks | 4.C. Manufacturing and Assembly Process Inspection | |
| Inspection/Boilers/3.A. Periodic Inspection | 3.A.1. Steam Boiler | 3.A. Periodic Inspection | Regulation on Health and Safety Requirements for the Use of Work Equipment |
| Inspection/Boilers/3.A. Periodic Inspection | 3.A.2. Central Heating/Hot Water Boiler | 3.A. Periodic Inspection | Regulation on Health and Safety Requirements for the Use of Work Equipment |
| Inspection/Boilers/3.A. Periodic Inspection | 3.A.3. Ironing Boiler | 3.A. Periodic Inspection | Regulation on Health and Safety Requirements for the Use of Work Equipment |
| Inspection/Boilers/3.A. Periodic Inspection | 3.A.4. Thermal Oil Boiler | 3.A. Periodic Inspection | Regulation on Health and Safety Requirements for the Use of Work Equipment |
| Inspection/Boilers/3.A. Periodic Inspection | 3.A.5. Dyeing Boiler | 3.A. Periodic Inspection | Regulation on Health and Safety Requirements for the Use of Work Equipment |
| Inspection/Boilers/3.A. Periodic Inspection | 3.A.6. Steam Cooking Kettle | 3.A. Periodic Inspection | Regulation on Health and Safety Requirements for the Use of Work Equipment |
| Inspection/Boilers/3.A. Periodic Inspection | 3.A.7. High-Temperature Water Boiler | 3.A. Periodic Inspection | Regulation on Health and Safety Requirements for the Use of Work Equipment |
| Inspection/Boilers/3.A. Periodic Inspection | 3.A.8. Steam Generator | 3.A. Periodic Inspection | Regulation on Health and Safety Requirements for the Use of Work Equipment |
| Inspection/Boilers/3.B. Design Inspection | 3.B.1. Power Boilers | 3.B. Design Inspection | |
| Inspection/Boilers/3.B. Design Inspection | 3.B.2. Heating Boilers | 3.B. Design Inspection | |
| Inspection/Boilers/3.B. Design Inspection | 3.B.3. Steam Boilers | 3.B. Design Inspection | |
| Inspection/Boilers/3.B. Design Inspection | 3.B.4. Heat Recovery Steam Generator | 3.B. Design Inspection | |
| Inspection/Boilers/3.B. Design Inspection | 3.B.5. Fired Boilers | 3.B. Design Inspection | |
| Inspection/Boilers/3.B. Design Inspection | 3.B.6. Water-Tube Boilers | 3.B. Design Inspection | |
| Inspection/Boilers/3.B. Design Inspection | 3.B.7. Shell Boilers | 3.B. Design Inspection | |
| Inspection/Boilers/3.B. Design Inspection | 3.B.8. Manually and Automatically Fed Solid Fuel Boilers with a Nominal Heat Output of up to 300 kW | 3.B. Design Inspection | |
| Inspection/Boilers/3.C. Manufacturing and Assembly Process Inspection | 3.C.1. Power Boilers | 3.C. Manufacturing and Assembly Process Inspection | |
| Inspection/Boilers/3.C. Manufacturing and Assembly Process Inspection | 3.C.2. Heating Boilers | 3.C. Manufacturing and Assembly Process Inspection | |
| Inspection/Boilers/3.C. Manufacturing and Assembly Process Inspection | 3.C.3. Steam Boilers | 3.C. Manufacturing and Assembly Process Inspection | |
| Inspection/Boilers/3.C. Manufacturing and Assembly Process Inspection | 3.C.4. Heat Recovery Steam Generator | 3.C. Manufacturing and Assembly Process Inspection | |
| Inspection/Boilers/3.C. Manufacturing and Assembly Process Inspection | 3.C.5. Fired Boilers | 3.C. Manufacturing and Assembly Process Inspection | |
| Inspection/Boilers/3.C. Manufacturing and Assembly Process Inspection | 3.C.6. Water-Tube Boilers | 3.C. Manufacturing and Assembly Process Inspection | |
| Inspection/Boilers/3.C. Manufacturing and Assembly Process Inspection | 3.C.7. Shell Boilers | 3.C. Manufacturing and Assembly Process Inspection | |
| Inspection/Boilers/3.C. Manufacturing and Assembly Process Inspection | 3.C.8. Manually and Automatically Fed Solid Fuel Boilers with a Nominal Heat Output of up to 300 kW | 3.C. Manufacturing and Assembly Process Inspection | |
| Inspection/Pressure vessels/2.A. Periodic Inspection | 2.A.1. Industrial Autoclave | 2.A. Periodic Inspection | Regulation on Health and Safety Requirements for the Use of Work Equipment |
| Inspection/Pressure vessels/2.A. Periodic Inspection | 2.A.3. Compressor Air Receiver | 2.A. Periodic Inspection | Regulation on Health and Safety Requirements for the Use of Work Equipment |
| Inspection/Pressure vessels/2.A. Periodic Inspection | 2.A.2. Compressed Air Receiver | 2.A. Periodic Inspection | Regulation on Health and Safety Requirements for the Use of Work Equipment |
| Inspection/Pressure vessels/2.A. Periodic Inspection | 2.A.5. Steam Generator | 2.A. Periodic Inspection | Regulation on Health and Safety Requirements for the Use of Work Equipment |
| Inspection/Pressure vessels/2.A. Periodic Inspection | 2.A.4. Booster/Expansion Tank | 2.A. Periodic Inspection | Regulation on Health and Safety Requirements for the Use of Work Equipment |
| Inspection/Pressure vessels/2.A. Periodic Inspection | 2.A.6. Hot Water Cylinder/Storage Tank | 2.A. Periodic Inspection | Regulation on Health and Safety Requirements for the Use of Work Equipment |
| Inspection/Pressure vessels/2.A. Periodic Inspection | 2.A.7. Liquefied Gas Tanks | 2.A. Periodic Inspection (Inspection Only) | Regulation on Health and Safety Requirements for the Use of Work Equipment |
| 2.A.7.1. Aboveground Liquefied Gas Tanks | 2.A. Periodic Inspection (Reassessment) | ||
| 2.A.7.2. Underground Liquefied Gas Tanks | |||
| Inspection/Pressure vessels/2.A. Periodic Inspection | 2.A.8. Cryogenic Tanks | 2.A. Periodic Inspection | Regulation on Health and Safety Requirements for the Use of Work Equipment |
| Inspection/Pressure vessels/2.A. Periodic Inspection | 2.A.9. Dyeing Vessel or Unfired Pressure Vessel | 2.A. Periodic Inspection | Regulation on Health and Safety Requirements for the Use of Work Equipment |
| Inspection/Pressure vessels/2.A. Periodic Inspection | 2.A.10. Compressed Gas Cylinders | 2.A. Periodic Inspection | Regulation on Health and Safety Requirements for the Use of Work Equipment |
| Inspection/Pressure vessels/2.B. Design Inspection | 2.B.1. Unfired Pressure Vessels | 2.B. Design Inspection | |
| Inspection/Pressure vessels/2.B. Design Inspection | 2.B.2. Low-Pressure Storage Tanks | 2.B. Design Inspection | |
| Inspection/Pressure vessels/2.B. Design Inspection | 2.B.3. Non-Fired Pressure Vessels Designed to Contain Air or Nitrogen | 2.B. Design Inspection | |
| Inspection/Pressure vessels/2.B. Design Inspection | 2.B.4. Transportable, Refillable Welded Steel Cylinders for Liquefied Petroleum Gas (LPG) | 2.B. Design Inspection | |
| Inspection/Pressure vessels/2.B. Design Inspection | 2.B.5. Serially Produced, Welded Steel Cylindrical Stationary Liquefied Petroleum Gas (LPG) Tanks with a Capacity Not Exceeding 13 m³ | 2.B. Design Inspection | |
| Inspection/Pressure vessels/2.B. Design Inspection | 2.B.6. Welded Steel Tanks for Liquefied Petroleum Gas (LPG) — Road Tankers | 2.B. Design Inspection | |
| Inspection/Pressure vessels/2.B. Design Inspection | 2.B.7. Closed Expansion Vessels with Diaphragms for Water Installations | 2.B. Design Inspection | |
| Inspection/Pressure vessels/2.B. Design Inspection | 2.B.8.1. Transportable Vacuum-Insulated Vessels | 2.B. Design Inspection | |
| Inspection/Pressure vessels/2.B. Design Inspection | 2.B.8.2. Static Vacuum-Insulated Tanks | 2.B. Design Inspection | |
| Inspection/Pressure vessels/2.B. Design Inspection | 2.B.8.3. Static Non-Vacuum-Insulated Tanks | 2.B. Design Inspection | |
| Inspection/Pressure vessels/2.B. Design Inspection | 2.B.8.4. Large Transportable Non-Vacuum-Insulated Vessels | 2.B. Design Inspection | |
| Inspection/Pressure vessels/2.B. Design Inspection | 2.B.8.5. Transportable Vacuum-Insulated Tanks with a Capacity Not Exceeding 1000 Litres | 2.B. Design Inspection | |
| Inspection/Pressure vessels/2.B. Design Inspection | 2.B.9. Pressurised Metallic Tanks for the Transport of Dangerous Goods | 2.B. Design Inspection | |
| Inspection/Pressure vessels/2.C. Manufacturing and Assembly Process Inspection | 2.C.1. Unfired Pressure Vessels | 2.C. Manufacturing and Assembly Process Inspection | |
| Inspection/Pressure vessels/2.C. Manufacturing and Assembly Process Inspection | 2.C.2. Low-Pressure Storage Tanks | 2.C. Manufacturing and Assembly Process Inspection | |
| Inspection/Pressure vessels/2.C. Manufacturing and Assembly Process Inspection | 2.C.3. Non-Fired Pressure Vessels Designed to Contain Air or Nitrogen | 2.C. Manufacturing and Assembly Process Inspection | |
| Inspection/Pressure vessels/2.C. Manufacturing and Assembly Process Inspection | 2.C.4. Transportable, Refillable Welded Steel Cylinders for Liquefied Petroleum Gas (LPG) | 2.C. Manufacturing and Assembly Process Inspection | |
| Inspection/Pressure vessels/2.C. Manufacturing and Assembly Process Inspection | 2.C.5. Serially Produced, Welded Steel Cylindrical Stationary Liquefied Petroleum Gas (LPG) Tanks with a Capacity Not Exceeding 13 m3 | 2.C. Manufacturing and Assembly Process Inspection | |
| Inspection/Pressure vessels/2.C. Manufacturing and Assembly Process Inspection | 2.C.6. Welded Steel Tanks for Liquefied Petroleum Gas (LPG) — Road Tankers | 2.C. Manufacturing and Assembly Process Inspection | |
| Inspection/Pressure vessels/2.C. Manufacturing and Assembly Process Inspection | 2.C.7. Closed Expansion Vessels with Diaphragms for Water Installations | 2.C. Manufacturing and Assembly Process Inspection | |
| Inspection/Pressure vessels/2.C. Manufacturing and Assembly Process Inspection | 2.C.8.1. Transportable Vacuum-Insulated Vessels | 2.C. Manufacturing and Assembly Process Inspection | |
| Inspection/Pressure vessels/2.C. Manufacturing and Assembly Process Inspection | 2.C.8.2. Static Vacuum-Insulated Tanks | 2.C. Manufacturing and Assembly Process Inspection | |
| Inspection/Pressure vessels/2.C. Manufacturing and Assembly Process Inspection | 2.C.8.3. Static Non-Vacuum-Insulated Tanks | 2.C. Manufacturing and Assembly Process Inspection | |
| Inspection/Pressure vessels/2.C. Manufacturing and Assembly Process Inspection | 2.C.8.4. Large Transportable Non-Vacuum-Insulated Vessels | 2.C. Manufacturing and Assembly Process Inspection | |
| Inspection/Pressure vessels/2.C. Manufacturing and Assembly Process Inspection | 2.C.8.5. Transportable Vacuum-Insulated Tanks with a Capacity Not Exceeding 1000 Litres | 2.C. Manufacturing and Assembly Process Inspection | |
| Inspection/Pressure vessels/2.C. Manufacturing and Assembly Process Inspection | 2.C.9. Pressurised Metallic Tanks for the Transport of Dangerous Goods | 2.C. Manufacturing and Assembly Process Inspection | |
| Inspection/Pressure vessels/2.A. Periodic Inspection | 2.A.11 Pressure vessels | 2.A Periodic Inspection | API 510 |
| Inspection/Lifting and Conveying Machinery/1.A. Periodic Inspection | 1.A.1.1. Bridge / Overhead Travelling Crane | 1. A. Periodic Inspection | Regulation on Health and Safety Requirements for the Use of Work Equipment |
| Inspection/Lifting and Conveying Machinery/1.A. Periodic Inspection | 1.A.1.2. Gantry Crane | 1. A. Periodic Inspection | Regulation on Health and Safety Requirements for the Use of Work Equipment |
| Inspection/Lifting and Conveying Machinery/1.A. Periodic Inspection | 1.A.1.3. Monorail Crane | 1. A. Periodic Inspection | Regulation on Health and Safety Requirements for the Use of Work Equipment |
| Inspection/Lifting and Conveying Machinery/1.A. Periodic Inspection | 1.A.1.4. Mobile Crane | 1. A. Periodic Inspection | Regulation on Health and Safety Requirements for the Use of Work Equipment |
| Inspection/Lifting and Conveying Machinery/1.A. Periodic Inspection | 1.A.1.5. Tower Crane | 1. A. Periodic Inspection | Regulation on Health and Safety Requirements for the Use of Work Equipment |
| Inspection/Lifting and Conveying Machinery/1.A. Periodic Inspection | 1.A.1.6. Loader Crane | 1. A. Periodic Inspection | Regulation on Health and Safety Requirements for the Use of Work Equipment |
| Inspection/Lifting and Conveying Machinery/1.A. Periodic Inspection | 1.A.1.7. Floating Crane | 1. A. Periodic Inspection | Regulation on Health and Safety Requirements for the Use of Work Equipment |
| Inspection/Lifting and Conveying Machinery/1.A. Periodic Inspection | 1.A.1.8. Container / Deck Crane | 1. A. Periodic Inspection | Regulation on Health and Safety Requirements for the Use of Work Equipment |
| Inspection/Lifting and Conveying Machinery/1.A. Periodic Inspection | 1.A.1.9. Jib Crane | 1. A. Periodic Inspection | Regulation on Health and Safety Requirements for the Use of Work Equipment |
| Inspection/Lifting and Conveying Machinery/1.A. Periodic Inspection | 1.A.1.10. Portal and Pedestal Crane | 1. A. Periodic Inspection | Regulation on Health and Safety Requirements for the Use of Work Equipment |
| Inspection/Lifting and Conveying Machinery/1.A. Periodic Inspection | 1.A.1.11. Slewing Jib Crane | 1. A. Periodic Inspection | Regulation on Health and Safety Requirements for the Use of Work Equipment |
| Inspection/Lifting and Conveying Machinery/1.A. Periodic Inspection | 1.A.1.12. Derrick Crane | 1. A. Periodic Inspection | Regulation on Health and Safety Requirements for the Use of Work Equipment |
| Inspection/Lifting and Conveying Machinery/1.A. Periodic Inspection | 1.A.1.13. Locomotive / Railway Crane | 1. A. Periodic Inspection | Regulation on Health and Safety Requirements for the Use of Work Equipment |
| Inspection/Lifting and Conveying Machinery/1.A. Periodic Inspection | 1.A.1.14. Portal Slewing Crane | 1. A. Periodic Inspection | Regulation on Health and Safety Requirements for the Use of Work Equipment |
| Inspection/Lifting and Conveying Machinery/1.A. Periodic Inspection | 1.A.1.15. Pedestal Slewing Crane | 1. A. Periodic Inspection | Regulation on Health and Safety Requirements for the Use of Work Equipment |
| Inspection/Lifting and Conveying Machinery/1.A. Periodic Inspection | 1.A.2. Chain Hoist | 1. A. Periodic Inspection | Regulation on Health and Safety Requirements for the Use of Work Equipment |
| Inspection/Lifting and Conveying Machinery/1.A. Periodic Inspection | 1.A.3.1. Mobile Elevating Work Platform | 1. A. Periodic Inspection | Regulation on Health and Safety Requirements for the Use of Work Equipment |
| Inspection/Lifting and Conveying Machinery/1.A. Periodic Inspection | 1.A.3.2. Power-Operated Lifting Platform for People with Impaired Mobility | 1. A. Periodic Inspection | Regulation on Health and Safety Requirements for the Use of Work Equipment |
| Inspection/Lifting and Conveying Machinery/1.A. Periodic Inspection | 1.A.3.3. Suspended Access Equipment | 1. A. Periodic Inspection | Regulation on Health and Safety Requirements for the Use of Work Equipment |
| Inspection/Lifting and Conveying Machinery/1.A. Periodic Inspection | 1.A.3.4. Mast Climbing Work Platform | 1. A. Periodic Inspection | Regulation on Health and Safety Requirements for the Use of Work Equipment |
| Inspection/Lifting and Conveying Machinery/1.A. Periodic Inspection | 1.A.4. Vehicle Lifting Equipment | 1. A. Periodic Inspection | Regulation on Health and Safety Requirements for the Use of Work Equipment |
| Inspection/Lifting and Conveying Machinery/1.A. Periodic Inspection | 1.A.5. Service Lift | 1. A. Periodic Inspection | Regulation on Health and Safety Requirements for the Use of Work Equipment |
| Inspection/Lifting and Conveying Machinery/1.A. Periodic Inspection | 1.A.6. Jack | 1. A. Periodic Inspection | Regulation on Health and Safety Requirements for the Use of Work Equipment |
| Inspection/Lifting and Conveying Machinery/1.A. Periodic Inspection | 1.A.7.1. Wire Rope Puller | 1. A. Periodic Inspection | Regulation on Health and Safety Requirements for the Use of Work Equipment |
| Inspection/Lifting and Conveying Machinery/1.A. Periodic Inspection | 1.A.7.2. Chain Puller | 1. A. Periodic Inspection | Regulation on Health and Safety Requirements for the Use of Work Equipment |
| Inspection/Lifting and Conveying Machinery/1.A. Periodic Inspection | 1.A.8. Pallet Truck | 1. A. Periodic Inspection | Regulation on Health and Safety Requirements for the Use of Work Equipment |
| Inspection/Lifting and Conveying Machinery/1.A. Periodic Inspection | 1.A.9. Stacker | 1. A. Periodic Inspection | Regulation on Health and Safety Requirements for the Use of Work Equipment |
| Inspection/Lifting and Conveying Machinery/1.A. Periodic Inspection | 1.A.10. Forklift | 1. A. Periodic Inspection | Regulation on Health and Safety Requirements for the Use of Work Equipment |
| Inspection/Lifting and Conveying Machinery/1.A. Periodic Inspection/1.A.11. Escalator | 1.A.11. Escalator | 1. A. Periodic Inspection | Regulation on Health and Safety Requirements for the Use of Work Equipment |
| Inspection/Lifting and Conveying Machinery/1.A. Periodic Inspection/1.A.12. Moving Walk | 1.A.12. Moving Walk | 1. A. Periodic Inspection | Regulation on Health and Safety Requirements for the Use of Work Equipment |
| Inspection/Lifting and Conveying Machinery/1.A. Periodic Inspection | 1.A.13. Variable-Reach Truck | 1. A. Periodic Inspection | Regulation on Health and Safety Requirements for the Use of Work Equipment |
| Inspection/Lifting and Conveying Machinery/1.A. Periodic Inspection | 1.A.14. Machinery Serving Fixed Landings | 1. A. Periodic Inspection | Regulation on Health and Safety Requirements for the Use of Work Equipment |
| Inspection/Lifting and Conveying Machinery/1.A. Periodic Inspection | 1.A.15. Parking Lift | 1. A. Periodic Inspection | Regulation on Health and Safety Requirements for the Use of Work Equipment |
| Inspection/Lifting and Conveying Machinery/1.A. Periodic Inspection/1.A.16. Cable Car | 1.A.16. Cable Car | 1. A. Periodic Inspection | Regulation on Health and Safety Requirements for the Use of Work Equipment |
| Inspection/Lifting and Conveying Machinery/1.A. Periodic Inspection/1.A.17. Chairlift | 1.A.17. Chairlift | 1. A. Periodic Inspection | Regulation on Health and Safety Requirements for the Use of Work Equipment |
| Inspection/Lifting and Conveying Machinery/1.A. Periodic Inspection/1.A.18. Ski Tow | 1.A.18. Ski Tow | 1. A. Periodic Inspection | Regulation on Health and Safety Requirements for the Use of Work Equipment |
| Inspection/Lifting and Conveying Machinery/1.A. Periodic Inspection | 1.A.19. Construction Hoist | 1. A. Periodic Inspection | Regulation on Health and Safety Requirements for the Use of Work Equipment |
| Inspection/Lifting and Conveying Machinery/1.A. Periodic Inspection | 1.A.20. Suspended Construction Crane | 1. A. Periodic Inspection | Regulation on Health and Safety Requirements for the Use of Work Equipment |
| Inspection/Lifting and Conveying Machinery/1.A. Periodic Inspection | 1.A.21. Mobile Loading Ramp | 1. A. Periodic Inspection | Regulation on Health and Safety Requirements for the Use of Work Equipment |
| Inspection/Lifting and Conveying Machinery/1.A. Periodic Inspection | 1.A.22. Tail Lift | 1. A. Periodic Inspection | Regulation on Health and Safety Requirements for the Use of Work Equipment |
| Inspection/Lifting and Conveying Machinery/1.B. Design Inspection | 1.B.1.1. Bridge / Overhead Travelling Crane | 1. B. Design Inspection | |
| Inspection/Lifting and Conveying Machinery/1.B. Design Inspection | 1.B.1.2. Gantry Crane | 1. B. Design Inspection | |
| Inspection/Lifting and Conveying Machinery/1.B. Design Inspection | 1.B.1.3. Monorail Crane | 1. B. Design Inspection | |
| Inspection/Lifting and Conveying Machinery/1.B. Design Inspection | 1.B.1.4. Mobile Crane | 1. B. Design Inspection | |
| Inspection/Lifting and Conveying Machinery/1.B. Design Inspection | 1.B.1.5. Tower Crane | 1. B. Design Inspection | |
| Inspection/Lifting and Conveying Machinery/1.B. Design Inspection | 1.B.1.6. Loader Crane | 1. B. Design Inspection | |
| Inspection/Lifting and Conveying Machinery/1.B. Design Inspection | 1.B.1.7. Floating Crane | 1. B. Design Inspection | |
| Inspection/Lifting and Conveying Machinery/1.B. Design Inspection | 1.B.1.8. Container / Deck Crane | 1. B. Design Inspection | |
| Inspection/Lifting and Conveying Machinery/1.B. Design Inspection | 1.B.1.9. Jib Crane | 1. B. Design Inspection | |
| Inspection/Lifting and Conveying Machinery/1.B. Design Inspection | 1.B.1.10. Portal and Pedestal Crane | 1. B. Design Inspection | |
| Inspection/Lifting and Conveying Machinery/1.B. Design Inspection | 1.B.1.11. Slewing Jib Crane | 1. B. Design Inspection | |
| Inspection/Lifting and Conveying Machinery/1.B. Design Inspection | 1.B.1.12. Derrick Crane | 1. B. Design Inspection | |
| Inspection/Lifting and Conveying Machinery/1.B. Design Inspection | 1.B.1.13. Locomotive / Railway Crane | 1. B. Design Inspection | |
| Inspection/Lifting and Conveying Machinery/1.B. Design Inspection | 1.B.1.14. Portal Slewing Crane | 1. B. Design Inspection | |
| Inspection/Lifting and Conveying Machinery/1.B. Design Inspection | 1.B.1.15. Pedestal Slewing Crane | 1. B. Design Inspection | |
| Inspection/Lifting and Conveying Machinery/1.B. Design Inspection | 1.B.2. Chain Hoist | 1. B. Design Inspection | |
| Inspection/Lifting and Conveying Machinery/1.B. Design Inspection | 1.B.3.1. Mobile Elevating Work Platform | 1. B. Design Inspection | |
| Inspection/Lifting and Conveying Machinery/1.B. Design Inspection | 1.B.3.2. Power-Operated Lifting Platform for People with Impaired Mobility | 1. B. Design Inspection | |
| Inspection/Lifting and Conveying Machinery/1.B. Design Inspection | 1.B.3.3. Suspended Access Equipment | 1. B. Design Inspection | |
| Inspection/Lifting and Conveying Machinery/1.B. Design Inspection | 1.B.3.4. Mast Climbing Work Platform | 1. B. Design Inspection | |
| Inspection/Lifting and Conveying Machinery/1.B. Design Inspection | 1.B.4. Vehicle Lifting Equipment | 1. B. Design Inspection | |
| Inspection/Lifting and Conveying Machinery/1.B. Design Inspection | 1.B.5. Service Lift | 1. B. Design Inspection | |
| Inspection/Lifting and Conveying Machinery/1.B. Design Inspection | 1.B.6. Jack | 1. B. Design Inspection | |
| Inspection/Lifting and Conveying Machinery/1.B. Design Inspection | 1.B.7.1. Wire Rope Puller | 1. B. Design Inspection | |
| Inspection/Lifting and Conveying Machinery/1.B. Design Inspection | 1.B.7.2. Chain Puller | 1. B. Design Inspection | |
| Inspection/Lifting and Conveying Machinery/1.B. Design Inspection | 1.B.8. Pallet Truck | 1. B. Design Inspection | |
| Inspection/Lifting and Conveying Machinery/1.B. Design Inspection | 1.B.9. Stacker | 1. B. Design Inspection | |
| Inspection/Lifting and Conveying Machinery/1.B. Design Inspection | 1.B.10. Forklift | 1. B. Design Inspection | |
| Inspection/Lifting and Conveying Machinery/1.B. Design Inspection/1.B.11. Escalator | 1.B.11. Escalator | 1. B. Design Inspection | |
| Inspection/Lifting and Conveying Machinery/1.B. Design Inspection/1.B.12. Moving Walk | 1.B.12. Moving Walk | 1. B. Design Inspection | |
| Inspection/Lifting and Conveying Machinery/1.B. Design Inspection | 1.B.13. Variable-Reach Truck | 1. B. Design Inspection | |
| Inspection/Lifting and Conveying Machinery/1.B. Design Inspection | 1.B.14. Machinery Serving Fixed Landings | 1. B. Design Inspection | |
| Inspection/Lifting and Conveying Machinery/1.B. Design Inspection | 1.B.15. Parking Lift | 1. B. Design Inspection | |
| Inspection/Lifting and Conveying Machinery/1.B. Design Inspection/1.B.16. Cable Car | 1.B.16. Cable Car | 1. B. Design Inspection | |
| Inspection/Lifting and Conveying Machinery/1.B. Design Inspection/1.B.17. Chairlift | 1.B.17. Chairlift | 1. B. Design Inspection | |
| Inspection/Lifting and Conveying Machinery/1.B. Design Inspection/1.B.18. Ski Tow | 1.B.18. Ski Tow | 1. B. Design Inspection | |
| Inspection/Lifting and Conveying Machinery/1.B. Design Inspection | 1.B.19. Construction Hoist | 1. B. Design Inspection | |
| Inspection/Lifting and Conveying Machinery/1.B. Design Inspection | 1.B.20. Suspended Construction Crane | 1. B. Design Inspection | |
| Inspection/Lifting and Conveying Machinery/1.B. Design Inspection | 1.B.21. Mobile Loading Ramp | 1. B. Design Inspection | |
| Inspection/Lifting and Conveying Machinery/1.B. Design Inspection | 1.B.22. Tail Lift | 1. B. Design Inspection | |
| Inspection/Lifting and Conveying Machinery/1.C. Manufacturing and Assembly Process Inspection | 1.C.1.1. Bridge / Overhead Travelling Crane | 1.C. Manufacturing and Assembly Process Inspection | |
| Inspection/Lifting and Conveying Machinery/1.C. Manufacturing and Assembly Process Inspection | 1.C.1.2. Gantry Crane | 1.C. Manufacturing and Assembly Process Inspection | |
| Inspection/Lifting and Conveying Machinery/1.C. Manufacturing and Assembly Process Inspection | 1.C.1.3. Monorail Crane | 1.C. Manufacturing and Assembly Process Inspection | |
| Inspection/Lifting and Conveying Machinery/1.C. Manufacturing and Assembly Process Inspection | 1.C.1.4. Mobile Crane | 1.C. Manufacturing and Assembly Process Inspection | |
| Inspection/Lifting and Conveying Machinery/1.C. Manufacturing and Assembly Process Inspection | 1.C.1.5. Tower Crane | 1.C. Manufacturing and Assembly Process Inspection | |
| Inspection/Lifting and Conveying Machinery/1.C. Manufacturing and Assembly Process Inspection | 1.C.1.6. Loader Crane | 1.C. Manufacturing and Assembly Process Inspection | |
| Inspection/Lifting and Conveying Machinery/1.C. Manufacturing and Assembly Process Inspection | 1.C.1.7. Floating Crane | 1.C. Manufacturing and Assembly Process Inspection | |
| Inspection/Lifting and Conveying Machinery/1.C. Manufacturing and Assembly Process Inspection | 1.C.1.8. Container / Deck Crane | 1.C. Manufacturing and Assembly Process Inspection | |
| Inspection/Lifting and Conveying Machinery/1.C. Manufacturing and Assembly Process Inspection | 1.C.1.9. Jib Crane | 1.C. Manufacturing and Assembly Process Inspection | |
| Inspection/Lifting and Conveying Machinery/1.C. Manufacturing and Assembly Process Inspection | 1.C.1.10. Portal and Pedestal Crane | 1.C. Manufacturing and Assembly Process Inspection | |
| Inspection/Lifting and Conveying Machinery/1.C. Manufacturing and Assembly Process Inspection | 1.C.1.11. Slewing Jib Crane | 1.C. Manufacturing and Assembly Process Inspection | |
| Inspection/Lifting and Conveying Machinery/1.C. Manufacturing and Assembly Process Inspection | 1.C.1.12. Derrick Crane | 1.C. Manufacturing and Assembly Process Inspection | |
| Inspection/Lifting and Conveying Machinery/1.C. Manufacturing and Assembly Process Inspection | 1.C.1.13. Locomotive / Railway Crane | 1.C. Manufacturing and Assembly Process Inspection | |
| Inspection/Lifting and Conveying Machinery/1.C. Manufacturing and Assembly Process Inspection | 1.C.1.14. Portal Slewing Crane | 1.C. Manufacturing and Assembly Process Inspection | |
| Inspection/Lifting and Conveying Machinery/1.C. Manufacturing and Assembly Process Inspection | 1.C.1.15. Pedestal Slewing Crane | 1.C. Manufacturing and Assembly Process Inspection | |
| Inspection/Lifting and Conveying Machinery/1.C. Manufacturing and Assembly Process Inspection | 1.C.2. Chain Hoist | 1.C. Manufacturing and Assembly Process Inspection | |
| Inspection/Lifting and Conveying Machinery/1.C. Manufacturing and Assembly Process Inspection | 1.C.3.1. Mobile Elevating Work Platform | 1.C. Manufacturing and Assembly Process Inspection | |
| Inspection/Lifting and Conveying Machinery/1.C. Manufacturing and Assembly Process Inspection | 1.C.3.2. Power-Operated Lifting Platform for People with Impaired Mobility | 1.C. Manufacturing and Assembly Process Inspection | |
| Inspection/Lifting and Conveying Machinery/1.C. Manufacturing and Assembly Process Inspection | 1.C.3.3. Suspended Access Equipment | 1.C. Manufacturing and Assembly Process Inspection | |
| Inspection/Lifting and Conveying Machinery/1.C. Manufacturing and Assembly Process Inspection | 1.C.3.4. Mast Climbing Work Platform | 1.C. Manufacturing and Assembly Process Inspection | |
| Inspection/Lifting and Conveying Machinery/1.C. Manufacturing and Assembly Process Inspection | 1.C.4. Vehicle Lifting Equipment | 1.C. Manufacturing and Assembly Process Inspection | |
| Inspection/Lifting and Conveying Machinery/1.C. Manufacturing and Assembly Process Inspection | 1.C.5. Service Lift | 1.C. Manufacturing and Assembly Process Inspection | |
| Inspection/Lifting and Conveying Machinery/1.C. Manufacturing and Assembly Process Inspection | 1.C.6. Jack | 1.C. Manufacturing and Assembly Process Inspection | |
| Inspection/Lifting and Conveying Machinery/1.C. Manufacturing and Assembly Process Inspection | 1.C.7.1. Wire Rope Puller | 1.C. Manufacturing and Assembly Process Inspection | |
| Inspection/Lifting and Conveying Machinery/1.C. Manufacturing and Assembly Process Inspection | 1.C.7.2. Chain Puller | 1.C. Manufacturing and Assembly Process Inspection | |
| Inspection/Lifting and Conveying Machinery/1.C. Manufacturing and Assembly Process Inspection | 1.C.8. Pallet Truck | 1.C. Manufacturing and Assembly Process Inspection | |
| Inspection/Lifting and Conveying Machinery/1.C. Manufacturing and Assembly Process Inspection | 1.C.9. Stacker | 1.C. Manufacturing and Assembly Process Inspection | |
| Inspection/Lifting and Conveying Machinery/1.C. Manufacturing and Assembly Process Inspection | 1.C.10. Forklift | 1.C. Manufacturing and Assembly Process Inspection | |
| Inspection/Lifting and Conveying Machinery/1.C. Manufacturing and Assembly Process Inspection/1.C.11. Escalator | 1.C.11. Escalator | 1.C. Manufacturing and Assembly Process Inspection | |
| Inspection/Lifting and Conveying Machinery/1.C. Manufacturing and Assembly Process Inspection/1.C.12. Moving Walk | 1.C.12. Moving Walk | 1.C. Manufacturing and Assembly Process Inspection | |
| Inspection/Lifting and Conveying Machinery/1.C. Manufacturing and Assembly Process Inspection | 1.C.13. Variable-Reach Truck | 1.C. Manufacturing and Assembly Process Inspection | |
| Inspection/Lifting and Conveying Machinery/1.C. Manufacturing and Assembly Process Inspection | 1.C.14. Machinery Serving Fixed Landings | 1.C. Manufacturing and Assembly Process Inspection | |
| Inspection/Lifting and Conveying Machinery/1.C. Manufacturing and Assembly Process Inspection | 1.C.15. Parking Lift | 1.C. Manufacturing and Assembly Process Inspection | |
| Inspection/Lifting and Conveying Machinery/1.C. Manufacturing and Assembly Process Inspection/1.C.16. Cable Car | 1.C.16. Cable Car | 1.C. Manufacturing and Assembly Process Inspection | |
| Inspection/Lifting and Conveying Machinery/1.C. Manufacturing and Assembly Process Inspection/1.C.17. Chairlift | 1.C.17. Chairlift | 1.C. Manufacturing and Assembly Process Inspection | |
| Inspection/Lifting and Conveying Machinery/1.C. Manufacturing and Assembly Process Inspection/1.C.18. Ski Tow | 1.C.18. Ski Tow | 1.C. Manufacturing and Assembly Process Inspection | |
| Inspection/Lifting and Conveying Machinery/1.C. Manufacturing and Assembly Process Inspection | 1.C.19. Construction Hoist | 1.C. Manufacturing and Assembly Process Inspection | |
| Inspection/Lifting and Conveying Machinery/1.C. Manufacturing and Assembly Process Inspection | 1.C.20. Suspended Construction Crane | 1.C. Manufacturing and Assembly Process Inspection | |
| Inspection/Lifting and Conveying Machinery/1.C. Manufacturing and Assembly Process Inspection | 1.C.21. Mobile Loading Ramp | 1.C. Manufacturing and Assembly Process Inspection | |
| Inspection/Lifting and Conveying Machinery/1.C. Manufacturing and Assembly Process Inspection | 1.C.22. Tail Lift | 1.C. Manufacturing and Assembly Process Inspection |
Let’s assess your needs together.
Share your company’s activities, target scope and priorities; let’s develop your training and consultancy plan together.
Get in touch ↗WhatsApp support